Skip to main content

Fast resurfacing work

A Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early.
February 22, 2012 Read time: 1 min
A 2395 Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early. Championship motorcycle races began at the Midlands' premier race venue last month after resurfacing of the 2.25km track that organisers say will see lap times tumble for the 2011 season. Some 3,000tonnes of surfacing material was laid, overall. The results are said to be good and racers who have tried the track say that the surface is smoother than the old and has a lot more grip.

The W210 is an innovative machine powered by twin engines and features a 2.2m wide milling drum. The machine can be tailored to suit conditions and has three selectable milling drum speeds, suiting large-scale surface course rehabilitation, complete pavement removal at full depth or fine milling. Other features include automatic parallel alignment, intelligent track drive control to maximise traction, and Wirtgen's proprietary Widrive machine management and Level Pro levelling systems.

For more information on companies in this article

Related Content

  • How bitumen technology solutions are solving paving problems around the world
    March 2, 2017
    This month we hear how additives can bring RAP back from the dead and fight the ravages of salt damage, how pellets reach parts that PMB can’t and how Shell and WeedsWest are expanding their respective businesses - Kristina Smith writes
  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • Ahmedabad airport roll-out for Dynapac
    September 7, 2022
    Dynapac machines have set production records during the upgrade of Sardar Vallabhbhai Patel International Airport in the Indian state of Gujarat.
  • TRL delivers its vision
    July 31, 2012
    The UK's world-renowned TRL (Transport Research Laboratory) is celebrating its 75th birthday this year, and the objective of its work has not changed In 1938 Richard Stradling, director, wrote that "the objective of all the research work at RRL [now TRL] is to accumulate that body of scientific knowledge which is an essential factor in the economical and efficient construction and maintenance of our roads. Practical application of the results must be the aim throughout." While TRL's remit today is far more