Skip to main content

Fast resurfacing work

A Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early.
February 22, 2012 Read time: 1 min
A 2395 Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early. Championship motorcycle races began at the Midlands' premier race venue last month after resurfacing of the 2.25km track that organisers say will see lap times tumble for the 2011 season. Some 3,000tonnes of surfacing material was laid, overall. The results are said to be good and racers who have tried the track say that the surface is smoother than the old and has a lot more grip.

The W210 is an innovative machine powered by twin engines and features a 2.2m wide milling drum. The machine can be tailored to suit conditions and has three selectable milling drum speeds, suiting large-scale surface course rehabilitation, complete pavement removal at full depth or fine milling. Other features include automatic parallel alignment, intelligent track drive control to maximise traction, and Wirtgen's proprietary Widrive machine management and Level Pro levelling systems.

For more information on companies in this article

Related Content

  • It’s Miller time for Doosan excavators and loaders in Scotland
    April 17, 2018
    Scottish Doosan dealer Balgownie has supplied new Doosan DX225LC-5 22tonne and DX255LC-5 25tonne excavators and a new DL420-5 wheeled loader to Miller Plant. Miller Plant offers services from bulk earthworks and contract crushing and screening to plant hire, site clearance, demolition, aggregate supply and heavy haulage and tipper hire. As the machines will do more than 60 hours a week each, they come with a peace-of-mind five-year warranty and Balgownie’s fast response to requests and service support.
  • Better road surfaces to last longer
    August 23, 2013
    Preservation can make roads perform better and last longer - and save money in the long run. Kristina Smith reports BAM Wegen has laid the first ever half-warm porous asphalt section on a major highway in the Netherlands. The asphalt for the 500m-long test section on the A18 near Varsseveld was produced at 105°C rather than 160°C, representing a saving on energy and CO2 emissions of around 30%.
  • On stable ground with reclaimer/stabilisers
    November 6, 2018
    Sophisticated reclaimer/stabiliser equipment from Roadtec has been used to provide a base for a large car parking area and industrial building in the US state of Indiana. The ground in the area is well-suited to agriculture, however this is less well-suited to construction. As a result the developer decided to use a large-scale soil stabilising approach so as to ensure that the area would make a stable base for the project. Local contractor Stabilization Services was brought in to prepare the ground. The
  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division