Skip to main content

Tarmac wins maintenance deal for UK’s A1(M)

Tarmac has won a major new highways maintenance contract extension for a key section of the UK’s busy A1(M) between Darrington and Dishforth.
October 18, 2019 Read time: 1 min
The firm was first appointed to the scheme in 2011. The company has won a new nine-year agreement, which extends the existing contract until 2028. Tarmac’s Highway Services business will continue to operate and maintain the section of the motorway in Yorkshire managed by Road Management Services (Darrington) Limited.

 

The contract will involve Tarmac continuing to deliver services including maintaining and resurfacing the highway. It will also include regular inspections, maintenance of bridges, pavements, drainage, motorway communications and environmental works such as grass cutting and landscaping.

The company will also be responsible for a comprehensive winter maintenance programme, the provision of 24-hour emergency response teams and reactive traffic management services.

The A1(M) motorway through Yorkshire forms part of a strategic link in the national network between Scotland, the north east and the south of England.

 

For more information on companies in this article

Related Content

  • Gordie Howe Bridge opening date set
    January 15, 2024
    The bridge connecting Detroit in the US state of Michigan and Windsor in the Canadian province of Ontaria will open in September next year.
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl
  • Sanibel Causeway restoration completed
    June 2, 2025
    US$328m project restores Florida causeway devastated by Hurricane Ian in 2022
  • Clearview magnetometer trial detects alternative to loops
    October 1, 2019
    An UK investigation into the performance of Clearview Intelligence’s magnetometers as an alternative to inductive loops on MIDAS installations has concluded they deliver like-for-like results.