Skip to main content

Severn Bridge resurfacing complete

Contractor Hanson has completed the latest phase of its resurfacing work on the Severn bridges following the removal of the toll booths and barriers. The contract for Highways England started in December 2018, when the tolls were abolished on the M4 Prince of Wales Bridge and M48 Severn Bridge, and resurfacing was needed for the new road layout. The move to provide free access for drivers from England into Wales is aimed at boosting the Welsh economy. Over the last few weeks Hanson has laid more than
April 30, 2019 Read time: 2 mins
Resurfacing work is complete for the Severn bridges
Contractor 2644 Hanson has completed the latest phase of its resurfacing work on the Severn bridges following the removal of the toll booths and barriers.


The contract for 8100 Highways England started in December 2018, when the tolls were abolished on the M4 Prince of Wales Bridge and M48 Severn Bridge, and resurfacing was needed for the new road layout. The move to provide free access for drivers from England into Wales is aimed at boosting the Welsh economy.

Over the last few weeks Hanson has laid more than 10,000tonnes of base, binder and surface course material to complete the remodelling of the westbound side of the M4 Prince of Wales Bridge. The contracting team laid the final 2,200tonnes overnight in just 12 hours – more than double the amount usually handled on a regular motorway nightshift.

As well as resurfacing the toll booth area, the work has included 950m of the westbound carriageway and a new emergency access road.

Next month (May), the Hanson team will start a similar job on the M48 Severn Bridge; resurfacing the toll booth plaza as well as 1.5km of carriageway on both sides of the bridge.

Hannah Milliner, Severn Bridges General Manager at Highways England said: “This is a significant project for the region and Hanson has worked collaboratively with Highways England and its contractors to ensure that we deliver these works both safely and to schedule. Hanson has played an important part in making toll removal a success. We are currently reaching the final stages of the scheme and drivers will soon be able to benefit from free-flowing motorways.”

For more information on companies in this article

Related Content

  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
  • Cleveland Bridge reports healthy results
    September 30, 2019
    Cleveland Bridge UK reports healthy results for the fourth consecutive year. The firm’s strong profits are said to add further strength to its balance sheet and it is continuing to develop its order book with new projects. Despite uncertainty in the UK construction sector due to Brexit, the Darlington-based company achieved a turnover of £37 million for its financial year ending 31st December 2018, with an operating profit of £1.2 million and an improving balance sheet. Cleveland Bridge continued to grow
  • Eurovia delivers Tempera to UK county
    December 2, 2020
    Eurovia is delivering high volumes of its low-temperature asphalt binder course Tempera in the UK county of Essex.