Skip to main content

Noise reducing pavement for Motorring 3?

The Danish parliament has ordered noise reduction studies to be done on the Motorring 3 motorway near the capital Copenhagen.
By David Arminas January 29, 2024 Read time: 2 mins
To widen or improve noise reduction along the busy Motorring 3 near Copenhagen? (image © Rolandm/Dreamstime)

The Danish road authorities are considering using a noise reducing pavement, similar types in Germany and the Netherlands, on Copenhagen’s busy Motorring 3.

The Danish parliament has said it will considering improving the noise reduction systems along Motorring 3 rather than spending money on widening the busy motorway from four to six lanes.

The 19km-long Motorring 3, west of the capital, connects the Helsingør motorway with the Køge Bugt motorway and is part of the European roads E47  and E55. Around 48,000 vehicles used the highway daily in 1990, rising to about 130,000 in recent years, according to data from Vejdirektoratet, Denmark’s national road directorate.

Around €48 million was set aside for extending the Motorring 3, a project that has now been put on hold, according to a report in the Danish engineering newspaper Ingenioren. The idea was to make the hard shoulder, or emergency land, into a live running lane, as well as a reduction in speed from 110kph to 90kph, the newspaper noted.

Instead, three noise-reduction methods will be studied: extension of the existing noise barriers, an updated more modern physical noise barrier to be built in the middle section of the motorway and a type of new noise-reducing asphalt already used in Germany and the Netherlands.

The noise reduction study must be completed by mid-2024 and then a final decision will be made on what the earmarked money will be must be used.

For more information on companies in this article

Related Content

  • German government to adhere to Fehmarn Belt tunnel plans
    April 30, 2015
    Germany is to adhere to plans for a tunnel between Fehmarn, Germany, and Lolland, Denmark despite criticism over the cost and a delayed schedule. Denmark alone is likely to foot the €7.4 billion bill for the prestigious Fehmarn Belt Fixed Link immersed tunnel while Germany will pay for only access roads and other connections on its territory. Angela Merkel, Chancellor of Germany, said her government and transport authorities will respond to more than 3,000 objections over the construction of the tunne
  • Tarmac’s plan for cutting traffic disruption from roadworks
    October 19, 2020
    Tarmac has a cunning plan for cutting traffic disruption from roadworks.
  • Noise and crash barriers, high strength protection
    February 15, 2012
    HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of Balfour Beatty Civil Engineering along with equal joint venture partners Morga
  • We have the technology
    July 10, 2012
    'Le Barbare' or The Barbarian, the biggest wheel loader in the Caterpillar range, had already clocked up a respected 48,000 hours of heavy duty in the Belgian quarry Carrieres d'Antoing when a need for a bit of rejuvenation was identified. To carry out this careful operation, the local Caterpillar dealer Bergerat Monnoyeur tore the impressive 193tonne 994D wheel loader into thousands of pieces, reworked them all and then reassembled the whole machine with new or refreshed parts: it performed a full rebuild