Skip to main content

In the fast lane

More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group).
May 14, 2012 Read time: 1 min
More than 500 million people worldwide watched the first Formula 1 motor race in India's history.

The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company 1194 Vögele (a member of the 364 Wirtgen Group).

Working with four Super 1800-2 pavers, the Vögele team helped construct the Buddh International Circuit. And the result of the first race on 30 October, 2011 saw the German Formula 1 world champion Sebastian Vettel breaking the first course record with a lap time of 1.27 minutes.

A demanding 5.1km circuit with 16 bends, a road varying between 18m-25m in width, superelevations up to 12% and gradients up to 10%, distinguishes this newcomer to the Formula 1 racing calendar, and demands considerable driving skill, offering optimum conditions for breathtaking overtaking manoeuvres. Full story next issue.

For more information on companies in this article

Related Content

  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available
  • Asphalt advances and industry innovations in paving
    May 20, 2014
    Asphalt paving technology continues to develop, benefiting from new technologies and new diesel engines - Mike Woof reports The asphalt paving equipment market is seeing the introduction of new low emission engines that will meet the Tier 4 Final regulations for Europe and North America. These have required some major engineering changes, with firms now having to install bulky exhaust after-treatment systems and additional cooling for engines and turbos.
  • Delivering the smoothest road surfaces
    May 26, 2021
    Roads and highways have to be monitored and maintained regularly to ensure they are safe for use, and surface smoothness is a key factor for road quality. However, for racetracks (and airport runways) surface smoothness is even more important for safety and performance