Skip to main content

ALARMing UK road statistics, from the Asphalt Industry Alliance

Within years, one in six of UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM - survey. The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all local roads reportedly in poor structural condition, with less than five years of life remaining. The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions. Loca
March 27, 2017 Read time: 2 mins
Within years, one in six of UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM - survey.

The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all local roads reportedly in poor structural condition, with less than five years of life remaining.

The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions.

Local authorities need at least nearly €14 billion to bring the network up to scratch – a figure that has remained largely unchanged for four years, according to the report. The gap between the amount local authorities received this year and the amount they say they need to keep their roads in reasonable order is almost €845 million.

Alan Mackenzie, chairman of the AIA, said that local authority highway teams lack the resources to arrest the decline in local road conditions. “Despite this, efficiencies they have achieved in recent years through adopting an asset management approach should be applauded.

“Working smarter, greater collaboration and improved communication are all contributing to their ability to do more with less, though of course there will come a point when there are no further efficiency savings to be found,” he said.

The report found that a large number of local authorities have also been hit with unforeseen costs - England: 43%; London: 53%; Wales: 56%. The primary reason is structural failures caused by adverse weather and increased traffic.

The number of potholes filled over the past year has dropped again for the second successive year, but is still high at 1.7 million – one repaired every 19 seconds.

The 2017 edition was completed by 63% of authorities responsible for roads in England and Wales and was carried out during January and February. The survey is commissioned by the 1360 Asphalt Industry Alliance (AIA) which represents companies producing raw materials used in asphalt for roads and is collated, analysed and verified by an independent research company.

The full 2017 ALARM survey is available to download by visiting the website of the Asphalt Industry Alliance.

For more information on companies in this article

Related Content

  • Recycling from the wings to centre stage
    May 20, 2014
    Driven by the price of virgin aggregates and strong environmental concerns, the recycling of reclaimed asphalt already is and will increasingly be a hot topic within the asphalt plants’ and associated equipment manufacturing sector, says Kathrin Richter, marketing manager for Ammann’s Asphalt Division “Until a few years ago, the question was: How much reclaimed asphalt can one add to the recipe mix? Today, the question is more likely to be: How much fresh material should I add to the reclaimed asphalt? Ove
  • London’s Westminster Council goes for gully offenders
    February 8, 2018
    Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.
  • Belarus opts for a PPP road scheme
    August 12, 2019
    Belarus has started pre-qualification for what will be the country’s first public-private partnership – the M-10 motorway upgrade. David Arminas reports "There’s a little bit of almost everything in this project,” said Steve Gilpin, technical team leader and associate of engineers Ove Arup & Partners International. True to his word, there is. That was how Gilpin kicked off his presentation about Belarus’s planned M-10 motorway project to 180 international bankers, private investors, contractors and en
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*