Skip to main content

Removing runway rubber

When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges. One was finding a waterblasting system that would operate successfully in the 42º-52ºC daylight heat of the summer and also to find the fastest and most productive waterblasting system because of very limited runway closure time. Chemicals, shotblasting and other waterblasting equipment had been tried on the runways, but eventually engineers and management chose the Stripe Hog SH8000T manufactured by Waterblasting Tech
April 4, 2012 Read time: 2 mins

When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.

One was finding a waterblasting system that would operate successfully in the 42º-52ºC daylight heat of the summer and also to find the fastest and most productive waterblasting system because of very limited runway closure time.

Chemicals, shotblasting and other waterblasting equipment had been tried on the runways, but eventually engineers and management chose the Stripe Hog SH8000T manufactured by 362 Waterblasting Technologies.

The system, which can be built on a variety of truck chassis, uses needle sharp water jets to quickly remove all types of roadway and airfield marking paint as well as runway rubber deposit build-up.

According to the company the Dubai airport runways is probably the most challenging rubber removal environment in the world with an average of 800-plus movements a day with summer-time peaks of 1,100/day and an average of only 5-10 days of rain each year.

"With the ability to remove runway rubber deposits on average of 1,672m²/hour and the ability to operate in the extreme heat without breaking down, the SH8000T became the product of choice for the Dubai airport," says Waterblasting Technologies, which also offers the SH8000T or the new SH8000R with optional, on-board water recycling.

For more information on companies in this article

Related Content

  • Brussels road tunnel project complete
    March 1, 2022
    Construction work is complete on a key Brussels road tunnel project.
  • Show me the money at Australian Summit
    September 4, 2012
    The question of how to finance and fund major road infrastructure projects in Australia – including the potential role of user-pays charging as a funding solution – was top of mind at the recent Roads Australia National Summit in Sydney. The two-day summit, organised by peak national body Roads Australia, is the largest and most influential annual gathering of industry decision-makers in the country. This year’s summit was held against a backdrop of concern over the future of a raft of major road projects t
  • Concrete testing - defining standards
    February 13, 2012
    Concrete is a versatile construction product, but it must be tested to make sure that it is fit for purpose
  • Safer roads needed for the gig economy
    May 14, 2019
    Roads everywhere are becoming high-pressure workplaces for millions of gig economy workers, meaning traffic police need a new way to regulate how highways are used. Geoff Hadwick reports from Manchester, UK The way in which the world’s highways are designed, built and used needs to change fast as the gig economy becomes a global phenomenon. Millions of low-paid and badly-trained freelance drivers are now using road as their workplace, all of them working hard under huge amounts of pressure. The tren