Skip to main content

Liebherr opens a new logistics facility in Germany

The Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.
June 26, 2015 Read time: 2 mins
Liebherr has a new logistics facility for its earthmoving machines
The 718 Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.

The new central warehouse has an area of 47,000m², with space for about 100,000 different spare parts for the Earthmoving Equipment division. Parts are taken into and out of stock in the automatic warehouse areas, which can be up to 36m high. The firm says that its modern warehouse technology and order picking systems make it possible to ship 1,600 individual orders to many European countries, almost all of which on the day the order is received.

The location at Oberopfingen was chosen as it is next to the A7 Autobahn and is close to the major production site for Liebherr earthmoving machines at Kirchdorf an der Iller.

For more information on companies in this article

Related Content

  • Liebherr bullish with strong results
    April 5, 2022
    Liebherr is bullish with strong financial results.
  • Volvo CE’s electric quarry operation commences trials
    August 29, 2018
    Volvo CE is commencing operations of its low emission quarrying operation in Sweden. The facility has a strong focus on electric machines, with diesel-electric hybrid equipment also being used. According to the firm, this is a world first for a quarry facility that can be run almost 'emission-free'. Volvo CE and its customer Skanska have now commenced testing the viability of the Electric Site concept at Skanska’s Vikan Kross quarry, located near Gothenburg in Sweden. The production system at the site
  • Eurasphalt & Eurobitume 2016 Congress calls for better communication
    August 5, 2016
    The bitumen industry needs to learn how to communicate with road owners, road users, and communities. This was one of the underlying themes to emerge from the Eurasphalt & Eurobitume 2016 Congress, held in the Czech capital Prague in June. Kristina Smith was there.
  • Emissions legislation update
    July 20, 2012
    World events are driving the new focus on fuel economy for diesel engine development Spiralling fuel prices have put a new spin on technological developments in the engine and driveline sector. Recent legislation has been pushing manufacturers to develop cleaner running engines that are quieter and offer drastic reductions in exhaust emissions. For the engine and driveline manufacturers, research and development aimed at reducing engine fuel consumption is in hand but the market conditions have placed fresh