Skip to main content

Nepal road upgrades being planned

A series of infrastructure upgrades are planned for Nepal that will help improve its economic development. A key infrastructure requirement for Nepal is the development of its road network. In a move to tackle the issue, Nepal’s Ministry of Physical Infrastructure and Transport has initiated the strategy for the development of roads in all 75 districts by 2022. About US$7.5 billion has been estimated as being required for the completion of this project. Funding will require financing from internal sources
November 28, 2016 Read time: 2 mins
A new bridge is being built connecting Tanahun and Chitwan for the Prithvi Highway , which lies upstream of the old Mungling Bridge over Trishuli River
RSSA series of infrastructure upgrades are planned for Nepal that will help improve its economic development. A key infrastructure requirement for Nepal is the development of its road network. In a move to tackle the issue, Nepal’s Ministry of Physical Infrastructure and Transport has initiated the strategy for the development of roads in all 75 districts by 2022.

About US$7.5 billion has been estimated as being required for the completion of this project. Funding will require financing from internal sources and substantial foreign investment. This exclusive report has been provided by World Highways correspondent in Nepal, Ram Krishna Wagle.

After the completion of the five year project, there will be five highways connecting India and China through Rani-Itahari-Dhankuta-Leguwaghat-khadibari-kimthanka way (310km) and Thori-Bhandara-Malekhu-Galxi-Trishuli-BetriBati-Sheyfubasi-Rasuwagadi way (188km) respectively.

Similarly, Belhiya-Bhairawa-Palpa-Ramdi-Kaligandaki-RudraBani-Maldhunga-Beni-Jomsom-Chaile-korla way (390km), Birgunj-Narayanghat-Kathmandu-Tatopani way (392km) and Kathmandu-Terai fast track (73km) has been designed so as to meet the strategy.

Under this project, the government planned Jamunaha-Nepalgunj-Baghesiyal-khulalu-semikot-lelsa road (521km) will be built. At present, Nepal has only one East-West Highway but the plans call for three highways connecting east to west according to a government official.

According to an official, Postal highway; Puspalal (mid hill), East-west highway and Dharan-Hetuada-Tulsipur-Surkhet highway will be constructed. Likewise other 17 roads (654km) are estimated to complete by 2020. Similarly, the Nadha-Koshi pool chatar rupnagar road (61km,  Biratnagar ringroad (42km), Leghughat-Bhojpur (65km), Mathanthal- Ramechapa road (13km), Halesi-dhiktal road (35km), Mechi pool-Chandragadi-Birtamod road (12km) will be completed with this project.

Similarly, the Kathmandu ring road (27km) and Bhaktapur-Suryabinayak-Dhulikhel road (17km) road will be upgraded to four lanes within two years and five years respectively.

Within four years Nepal’s Government has plans to construct a series of two lanes roads. These are; Karnti Lokmarga (92km), Dkashinkali-Chaimalay-Sesnari-Khulekhani road (45km) and Sitapaila-Dharkay (24km). Lamosaghu-Tamakoshi-Jiri road (55km), Sahid Marg road Gorahi-Ghartigau (42km), Pokhara ring road (82km), Safebagar-Martadi road (28km), Bardaghat-Paladada-Tribeni road (13km), Balaju-Ranipauwa-Kakani-Trishuli road (53km), Chaharay-Bidur road (17km), Balkhu-Dhashinkali road (12km), Bhaktapur-Nagarkot-Sipakot road (16km), Bharatpur-Rampur-Meghauli road (16km), Janakpur ring road (74km) and Silgadi-Safnebagar road (65km).

Related Content

  • Many Moroccan motorway projects now in hand
    November 11, 2014
    Morocco’s Casablanca-Rabat motorway accounts for almost 20% of motorway tolls in the country, generating US$25.16 million for Autoroutes du Maroc (ADM) in the first half of 2014, a growth of 4.1% from the previous year. With relatively low maintenance costs (mainly used for widening the road) the Casablanca-Rabat motorway is ADM's most profitable route. The 76km route is travelled by 51,000 vehicles/day, far higher than any other motorway. The Berrechid-Agadir motorway (which includes Berrechid-Marrakesh an
  • Relief road eases Carlisle centre
    December 11, 2012
    The number of Heavy Goods Vehicles travelling through Carlisle’s city centre is estimated to have been reduced by more than a third since the new multi-million euro Carlisle Northern Development Route opened in February 2012. Information from a network of 20 permanent and temporary traffic counters around the city showing ‘before and after’ CNDR road usage is said to be starting to build a more meaningful picture of the impact the new road has had on Carlisle. It shows a marked reduction in both cars and HG
  • Sweden appoints Veidekke Anläggning to Förbifart Stockholm work
    May 2, 2019
    Sweden’s transport administration Trafikverket has appointed Veidekke Anläggning as a temporary contractor for work on the Lovön section of the Stockholm Bypass - Förbifart Stockholm. The deal is worth around €9.6 million. The contractor will take over work started by a tender winner whose contract has been cancelled, according to Swedish media. It is expected the new contractor will be on site until the end of the year, by which time Trafikverket says it hopes to have re-tendered the remaining work.
  • Consortium Via al Puerto to finish Colombia’s Buga-Buevantura road
    May 24, 2016
    Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway. Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years. Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais new