Skip to main content

Nepal road upgrades being planned

A series of infrastructure upgrades are planned for Nepal that will help improve its economic development. A key infrastructure requirement for Nepal is the development of its road network. In a move to tackle the issue, Nepal’s Ministry of Physical Infrastructure and Transport has initiated the strategy for the development of roads in all 75 districts by 2022. About US$7.5 billion has been estimated as being required for the completion of this project. Funding will require financing from internal sources
November 28, 2016 Read time: 2 mins
A new bridge is being built connecting Tanahun and Chitwan for the Prithvi Highway , which lies upstream of the old Mungling Bridge over Trishuli River
RSSA series of infrastructure upgrades are planned for Nepal that will help improve its economic development. A key infrastructure requirement for Nepal is the development of its road network. In a move to tackle the issue, Nepal’s Ministry of Physical Infrastructure and Transport has initiated the strategy for the development of roads in all 75 districts by 2022.

About US$7.5 billion has been estimated as being required for the completion of this project. Funding will require financing from internal sources and substantial foreign investment. This exclusive report has been provided by World Highways correspondent in Nepal, Ram Krishna Wagle.

After the completion of the five year project, there will be five highways connecting India and China through Rani-Itahari-Dhankuta-Leguwaghat-khadibari-kimthanka way (310km) and Thori-Bhandara-Malekhu-Galxi-Trishuli-BetriBati-Sheyfubasi-Rasuwagadi way (188km) respectively.

Similarly, Belhiya-Bhairawa-Palpa-Ramdi-Kaligandaki-RudraBani-Maldhunga-Beni-Jomsom-Chaile-korla way (390km), Birgunj-Narayanghat-Kathmandu-Tatopani way (392km) and Kathmandu-Terai fast track (73km) has been designed so as to meet the strategy.

Under this project, the government planned Jamunaha-Nepalgunj-Baghesiyal-khulalu-semikot-lelsa road (521km) will be built. At present, Nepal has only one East-West Highway but the plans call for three highways connecting east to west according to a government official.

According to an official, Postal highway; Puspalal (mid hill), East-west highway and Dharan-Hetuada-Tulsipur-Surkhet highway will be constructed. Likewise other 17 roads (654km) are estimated to complete by 2020. Similarly, the Nadha-Koshi pool chatar rupnagar road (61km,  Biratnagar ringroad (42km), Leghughat-Bhojpur (65km), Mathanthal- Ramechapa road (13km), Halesi-dhiktal road (35km), Mechi pool-Chandragadi-Birtamod road (12km) will be completed with this project.

Similarly, the Kathmandu ring road (27km) and Bhaktapur-Suryabinayak-Dhulikhel road (17km) road will be upgraded to four lanes within two years and five years respectively.

Within four years Nepal’s Government has plans to construct a series of two lanes roads. These are; Karnti Lokmarga (92km), Dkashinkali-Chaimalay-Sesnari-Khulekhani road (45km) and Sitapaila-Dharkay (24km). Lamosaghu-Tamakoshi-Jiri road (55km), Sahid Marg road Gorahi-Ghartigau (42km), Pokhara ring road (82km), Safebagar-Martadi road (28km), Bardaghat-Paladada-Tribeni road (13km), Balaju-Ranipauwa-Kakani-Trishuli road (53km), Chaharay-Bidur road (17km), Balkhu-Dhashinkali road (12km), Bhaktapur-Nagarkot-Sipakot road (16km), Bharatpur-Rampur-Meghauli road (16km), Janakpur ring road (74km) and Silgadi-Safnebagar road (65km).

Related Content

  • Virginia project for Parsons
    June 28, 2016
    Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.
  • Rio’s 2014 roads plan
    May 11, 2012
    The authorities in Brazil’s Rio de Janeiro State intend to invest US$1.55 billion in the road network from now until 2014. Work will be carried out to some 750km of roads with funding being provided by a combination of PPPs and sources such as the World Bank (WB) and the Latin American Development Bank (CAF).
  • Bridge improvements reduce flood threat
    February 16, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Bridge improvements reduce flood threat
    April 4, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).