Skip to main content

New factory for excavator components

Caterpillar plans to open a new manufacturing facility in Xuzhou, Jiangsu Province, China, to produce undercarriage components and track assemblies, which are utilised on Cat hydraulic excavators.
April 5, 2012 Read time: 2 mins

Caterpillar plans to open a new manufacturing facility in Xuzhou, Jiangsu Province, China, to produce undercarriage components and track assemblies, which are utilised on Cat hydraulic excavators.

Construction and modifications to pre-existing buildings will start in 2011, with production scheduled for mid-2012.

"This new facility is our latest strategic investment to continue expanding our presence and capacity in the Asia/Pacific region.

Together with our joint venture, AsiaTrak in Tianjin, China, which also manufactures undercarriage components and track, 178 Caterpillar is well positioned to meet the long-term demands of customers in China and Asia/Pacific," says Stu Levenick, Caterpillar group president with responsibility for customer and dealer support.

The 18,000m2 facility will be located in the Xuzhou Economic Development Zone, and when fully operational and at full capacity it is expected to employ about 400 people.

Caterpillar officials expect to realise a number of cost-saving benefits from the new facility, which will be located adjacent to the Caterpillar Xuzhou hydraulic excavator facility, allowing shipment of finished undercarriage components to the Caterpillar machine facility for final assembly.

"The investment in infrastructure and urbanisation forecasted in China's 12th Five-Year Plan should continue to drive long-term demand for construction equipment. This new facility, producing high-quality undercarriages for Cat excavators, further demonstrates our commitment to our customers' success, both in China and across the Asia/Pacific region," said Kevin Thieneman, Caterpillar country manager for China.

For more information on companies in this article

Related Content

  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Astec’s Shuttle Buggy lands in Australia
    March 5, 2024
    Performance reliability of the Roadtec SB-3000 Material Transfer Vehicle was a key factor in the contractor Boral’s decision to use it for paving work on the Western Sydney Airport Project.
  • Electric dawn
    August 20, 2024

    Volvo CE is following a revolutionary path in the market for earthmoving construction machines with its innovative, mid-size electric models – Mike Woof writes

  • UK firm JCB is investing further in its Indian operations
    October 24, 2012
    JCB intends to further invest in its manufacturing operations in India. The company plans to spend US$99 million (£62 million) on developing a new factory on a 20.83ha site in the city of Jaipur. The signing of the land purchase agreement in Rajasthan marks the beginning of a new expansion phase for JCB India, reinforcing its strong position in the Indian market.