Skip to main content

Kazakhstan boosts road repair budget

Kazakhstan is increasing the budget allotted for road repairs in the west of the country. The country’s government plans to allot some US$110 million (ZT 20 billion) for road repairs in West Kazakhstan. This sum will be used to fund repairs from 2014 until 2016.
October 10, 2014 Read time: 1 min
Kazakhstan is increasing the budget allotted for road repairs in the west of the country. The country’s government plans to allot some US$110 million (ZT 20 billion) for road repairs in West Kazakhstan. This sum will be used to fund repairs from 2014 until 2016.

Related Content

  • Nepal plans major infrastructure development
    July 21, 2015
    Nepal’s Ministry of Physical Infrastructure and Transport Management has been allocated US$524.48 million in the 2015-16 budget for developing infrastructure projects in the country. The country is faced with an additional challenge at present of repairing the links wrecked by the powerful earthquake that caused extensive damage all across Nepal. A budget of $309.8 million is being used for the Postal Highway, while a budget of $189.4 million has been set for the Mid-Hill highway. Some $97.1 million is bein
  • Panama plans road repairs
    March 1, 2012
    Panama is planning a project to repave up to 400km of roads, in a six month.
  • Mexican highway projects on track
    July 17, 2014
    Mexico’s road development programme for 2014 is well on track. According to the Secretariat of Communications and Transport in (SCT), some 92% of the budget set for road projects in 2014 has already been implemented. The SCT is now moving forward with its plans for road projects in 2015. The tender process for major contracts will be opening from mid-November 2014. A budget of some US$1.92 billion is being planned for road projects in 2015, a significant increase from the $1.15 billion set for 2014. The fir
  • Bridge repairs for Nepal
    April 30, 2012
    Repair work is underway in Nepal on a key bridge located on the Ratna Highway. The 117m bridge over the Bheri River links Surkhet and Dailekh was built in 1988 by a Chinese construction company and now required urgent repair. Work being carried out includes the removal of corrosion from truss sections using sand blasting and repainting to provide long term protection. Another major part of the repair involves raising the Eastern end of the bridge, which has damaged bolts and subsided due to overweight vehic