Skip to main content

Powerful underground drill rig

The new Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009. The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN).
February 24, 2012 Read time: 2 mins
The new DE150: Sandvik's most powerful drill rig for underground exploration
The new 325 Sandvik DE150 is Sandvik's most powerful exploration drill rig for underground exploration, and a surface version is under development and will be ready for market in the fourth quarter of 2009.

The DE150 (part of the expanded DE100 range) has a hydraulic feed cylinder designed to a push and pull capacity of 15tonnes (147 kN). Depth capacity is up to 2,000m (NQ rods), and in underground applications the DE150 is powered by a 110 kW electric power unit giving a maximum working pressure of 250 bar and oil flow of 300litres/min.

For surface application the DE150 can be powered by a diesel engine. The drill unit features a stiff and torsion resistant steel profile feed boom and a direct coupled feed cylinder with a feed length of 1,700mm and feed speed of maximum 0.63m/sec. The feed boom is mounted on a frame with tilt cylinder and mechanical supports, and the mounting frame has been specifically designed for quick and easy set-up when fan drilling with a full range of adjustment from vertical down to vertical up.

The group has also introduced its new Drill Shack for safety, health and environment, and to meet the requirements of Sandvik's DE130 and DE140 diamond core drills.

"This innovative and well thought-out solution makes it possible to operate in arctic or sub- tropical climates and is easily transportable by helicopter, packed in compact units or in its entirety by tracked vehicles or mounted on a hook lift frame," says Sandvik.

"The modular design of the new Drill Shack makes it suitable for both mobile and stationary units with quick assembly/pull down."

For more information on companies in this article

Related Content

  • Versatile truck-mounted compact crane
    March 15, 2012
    Cargotec believe companies operating in emerging markets will benefit greatly from using its new compact unit suited for mounting on light trucks. The Hiab ST 080 (stiff and telescopic) concept was developed to meet the need for a crane with good hoisting properties, a low weight and long lifetime.
  • FPT Industrial’s construction power solutions include new Cursor 16 engine
    January 29, 2015
    Powertrain manufacturer FPT Industrial will display its latest solutions for construction applications, including its new flagship engine, the Cursor 16, which “delivers 18litre performance in a 13litre package.” FPT, a brand of CNH Industrial, says its range for the construction sector is very broad, from 33-570kW, lately revamped with the state-of-the-art Cursor 16 engine for heavy-duty applications. The Cursor 16 is the company’s biggest solution for the world of construction and is compliant to Ti
  • FPT Industrial’s construction power solutions include new Cursor 16 engine
    January 6, 2017
    Powertrain manufacturer FPT Industrial will display its latest solutions for construction applications, including its new flagship engine, the Cursor 16, which “delivers 18litre performance in a 13litre package.” FPT, a brand of CNH Industrial, says its range for the construction sector is very broad, from 33-570kW, lately revamped with the state-of-the-art Cursor 16 engine for heavy-duty applications. The Cursor 16 is the company’s biggest solution for the world of construction and is compliant to Ti
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w