Skip to main content

Long-life pumping

A Tsurumi pump is still providing good service after 22 years in the fleet of Dutch rental firm Verno, which focusese on the construction market. The LB250 submersible model, for which production stopped over a decade ago, is thought to be the longest-serving Tsurumi pump in Europe. However, Verno, says that the unit's long service record is a product of its versatility, robust design and build quality
February 7, 2012 Read time: 1 min
Rugged and durable, a Tsurumi pump is still working well after 22 years hard use
A 2357 Tsurumi Pump is still providing good service after 22 years in the fleet of Dutch rental firm Verno, which focusese on the construction market. The LB250 submersible model, for which production stopped over a decade ago, is thought to be the longest-serving Tsurumi pump in Europe. However, Verno, says that the unit's long service record is a product of its versatility, robust design and build quality.

Pumping equipment is used in a wide array of construction applications, above and below ground, and usually it will only last ten years, so the fact that the Tsurumi LB250 belonging to Verno been in use for so long and has never needed a major repair is of note.

Since joining the company's fleet in 1988, the LB250 has been used in an array of projects in the Netherlands

For more information on companies in this article

Related Content

  • A fresh breath of air
    July 16, 2012
    With a new wave of exhaust emission regulations coming shortly, engine manufacturers are well on track to develop new solutions as Mike Woof reports A wave of technological advances has made the current generation of diesels the cleanest industrial engines ever produced. Driven by tightening controls on emissions, manufacturers have had to develop an array of innovative solutions that will help cut particulate and NOx being emitted from the tailpipe. When the phased reduction in exhaust emissions was first
  • Volvo CE bridging the gap for new Indian transport links
    December 11, 2013
    The old Pakuria Bridge in Jharkhand, India, ran over a dry riverbed and railway line situated 20km from Calcutta. Now obsolete, the bridge has been brought to the ground in 60 days using Volvo construction equipment West Bengal in eastern India is the nation’s fourth most populous region, boasting more people than the whole of Germany. The state is bordered by Nepal, Bhutan, Bangladesh, and five other states of India with more than 91 million inhabitants spread over 34,267m².
  • CECE 2018 conference Rome: the sector powers up for digitisation
    March 20, 2019
    Getting the human-machine interface for equipment automation right is a lot trickier than expected. David Arminas reports from the CECE conference in Rome For many contractors, digitisation is key for improving on-site operational efficiency. But it may be time to take stock of progress and examine what does and doesn’t work. That is not to say that the anchors should be thrown out to halt development. Far from it. In the past eight months, the CECE - Committee for European Construction Equipment – led
  • Samoter-Asphaltica 2014 sparks greater Italian optimism
    July 3, 2014
    The recent co-located Samoter and Asphaltica exhibitions at VeronaFiere in Verona, Italy, have been hailed a success by organisers, exhibiting companies and trade delegations, after more than 40,000 visitors, including thousands from outside Italy, attended the combined 445 exhibitor company-strong four-day events. There is no doubt, as Guy Woodford reports, they provided a timely boost to an Italian construction equipment manufacturing sector enduring tough times