Skip to main content

Long-life pumping

A Tsurumi pump is still providing good service after 22 years in the fleet of Dutch rental firm Verno, which focusese on the construction market. The LB250 submersible model, for which production stopped over a decade ago, is thought to be the longest-serving Tsurumi pump in Europe. However, Verno, says that the unit's long service record is a product of its versatility, robust design and build quality
February 7, 2012 Read time: 1 min
Rugged and durable, a Tsurumi pump is still working well after 22 years hard use
A 2357 Tsurumi Pump is still providing good service after 22 years in the fleet of Dutch rental firm Verno, which focusese on the construction market. The LB250 submersible model, for which production stopped over a decade ago, is thought to be the longest-serving Tsurumi pump in Europe. However, Verno, says that the unit's long service record is a product of its versatility, robust design and build quality.

Pumping equipment is used in a wide array of construction applications, above and below ground, and usually it will only last ten years, so the fact that the Tsurumi LB250 belonging to Verno been in use for so long and has never needed a major repair is of note.

Since joining the company's fleet in 1988, the LB250 has been used in an array of projects in the Netherlands

For more information on companies in this article

Related Content

  • Asphalt-rubber binder ideal for repairing worn roadways
    February 28, 2012
    Asphalt rubber is a medium that solves the problem of waste tyres and at the same time produces a material that is suitable for highway use.
  • Global pressures driving bitumen developments
    June 19, 2015
    A raft of global pressures is driving developments in the materials and equipment we use for the handling, storage and treatment of bitumen. The goal is to achieve better performance and longer life for less financial outlay, and at the same time overcome the challenges of inconsistent and varying bitumen supplies. Kristina Smith reports.
  • Better road surfaces to last longer
    August 23, 2013
    Preservation can make roads perform better and last longer - and save money in the long run. Kristina Smith reports BAM Wegen has laid the first ever half-warm porous asphalt section on a major highway in the Netherlands. The asphalt for the 500m-long test section on the A18 near Varsseveld was produced at 105°C rather than 160°C, representing a saving on energy and CO2 emissions of around 30%.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w