Skip to main content

Lanes Group praised for helping fast-track UK jam-busting road

The UK drainage and maintenance specialist Lanes Group has helped deliver the new A453 dual-carriageway in the county of Nottinghamshire, one of England’s worst congestion areas. Main contractor Laing O'Rourke managed the two-and-a-half-year project that included the widened commuter route from Junction 24 of the M1 motorway to the A52 highway in Nottingham city centre at a cost of US$265 million. The new road - named Remembrance Way in honour of the 453 British soldiers who lost their lives in Afgha
October 16, 2015 Read time: 2 mins
The UK drainage and maintenance specialist 7891 Lanes Group has helped deliver the new A453 dual-carriageway in the county of Nottinghamshire, one of England’s worst congestion areas.

Main contractor Laing O'Rourke managed the two-and-a-half-year project that included the widened commuter route from Junction 24 of the M1 motorway to the A52 highway in Nottingham city centre at a cost of US$265 million.

The new road - named Remembrance Way in honour of the 453 British soldiers who lost their lives in Afghanistan - opened in July.

Services provides by Lanes Group's depot in the city of Derby, included CCTV drainage surveys, drainage jetting, specialist cutting services, patch lining and pipe-deformity repair.

In one case, a CCTV survey found deformation of a 300mm diameter surface water pipe, 25m from the manhole access point and beneath a newly-laid roadway.

Laing O'Rourke considered the option of excavating the new roadway to replace the faulty pipe. However, Lanes was able to cut out the deformed inner wall of the plastic pipe and reline the section.

“We provided just about every service in our repertoire to support this scheme,” said Chris Norbury, area development manager for Lanes Derby. "We're delighted that, at key moments, our specialist expertise has made the difference in terms of resolving important drainage issues."

"On a number of occasions their specialist expertise has provided solutions that have saved us time and money,” said Laing O'Rourke civil engineer Joseph Maltezos.

A sub-contractor had mistakenly driven a spike through a drainage line. Lanes used a specialist cutter to remove it and patch line in the hole - avoiding a costly excavation.

For more information on companies in this article

Related Content

  • UK authority considers near US$560mn four-year build programme
    April 23, 2012
    Nottinghamshire County Council in the East Midlands region of England is considering a programme of maintenance projects and new building projects worth just under US$560million. The work would take place between 2013 and 2016 and would include a $31.3million project to widen the A453. A further $47million of the building fund could be invested in transport improvements and $18.8million a year may be used for highways maintenance.
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.