Skip to main content

Great work at Great Tew for a great Doosan DL580-5

Great Tew Ironstone Quarry in North Oxfordshire in the UK has purchased a new top-of-the-range Doosan DL580-5 wheeled loader to increase production. The DL580-5 carries huge 14-16tonne blocks of Ironstone from the quarry face to a new €1.2 million stone processing plant that recently began production at the top of the quarry. Great Tew Ironstone has a striking brown and blue vein and is only available from this Oxfordshire quarry. A quarried block is often up to 30tonnes. “The new DL580-5 helps
July 5, 2019 Read time: 2 mins
A Doosan DL580-5 does some heavy lifting in England
Great Tew Ironstone Quarry in North Oxfordshire in the UK has purchased a new top-of-the-range 695 Doosan DL580-5 wheeled loader to increase production.


The DL580-5 carries huge 14-16tonne blocks of Ironstone from the quarry face to a new €1.2 million stone processing plant that recently began production at the top of the quarry.   

Great Tew Ironstone has a striking brown and blue vein and is only available from this Oxfordshire quarry. A quarried block is often up to 30tonnes.

“The new DL580-5 helps to process up to 100tonnes of stone a day at the new quarry plant,” said Paul Keyte, operations director at Johnston Quarry Group which owns the quarry.

Equipped with specially matched pallet tines, the DL580-5 brings the large blocks from the base of the quarry to the top and along a short road, at the end of which it loads them on to the sawing machines in the processing plant. Previously, the quarry was only able to move blocks weighing up to a maximum of 10tonnes, so the arrival of the DL580-5 has made this a much more efficient process, explained Keyte.

The DL580-5 features an advanced double circuit axle cooling system to provide an ideal solution for heavier work. This ensures the DL580-5 is ideal not only for block lifting in quarries and mines, but also heavy-duty applications in industrial, construction and recycling operations.

The overall size of the DL580-5 is almost the same as the DL550-5, the next model down in the Doosan range, but it has an operating weight of 36,030kg and higher static tipping loads (straight/full turn 40°) of 29,700 and 26,200kg, respectively.

The new model is equipped with a series of features that make the machine extremely reliable and durable. The front structure is more rugged, with greater rigidity and strength. The DL580-5 has reinforced Z-bar kinematics for heavier lifting with few moving parts. This design also helps stabilise the loader, enables rapid bucket movements and keeps the bucket at the right angle position at all times, according to Doosan.

For more information on companies in this article

Related Content

  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Volvo develops pipe-laying equipment
    November 30, 2012
    Volvo Construction Equipment (CE) claims its new PL3005D pipelayer could be “revolutionary” in its market. Said to offer an unbeatable combination of superior stability with a 50tonne lifting capacity, the 35tonne 151kW Volvo D8H engine powered machine is part of Volvo CE’s comprehensive range of Tier 4 Interim launches. Due to its claimed ability to swing its superstructure through 360° the PL3005D can easily handle large, heavy pipes and place them anywhere around the machine, said to be unthinkable with
  • Working in tandem
    August 16, 2018
    A tandem crane lift has been carried out in Kuwait on a major project in using Demag machines from Terex. The two machines have been used on the Kuwaiti government's Sheikh Jaber Al Ahmad Al Sabah Causeway Project. This 36km-long road connection is among the world's largest infrastructure projects underway at present. The project includes a 27km-long bridge over Kuwait Bay. The Kuwaiti logistics service provider Integrated Logistics Company (ILC) is carrying out key sections of the project, moving pre-a
  • Magni’s RTH 5.39S rotating telescopic handler reaches for the top
    March 15, 2016
    Magni TH developed a rotating telescopic model which is among the highest-reaching in the world. The RTH 5.39S is a medium-size chassis and scissors stabilised. The chassis is the same as the RTH 5.30S and has been reinforced to resist the big stress of working at extreme height. The 38.7tonne machine has a maximum lifting capacity of 2tonnes, allowing a reach of up to 13 floors. The transmission is composed of a Euro 4 final Mercedes Engine with 170kW one Bosch Rexroth hydrostatic piston pump and a Bosc