Skip to main content

Drilling quick

Atlas Copco says that its latest T-thread drilling system offers up to 30% longer service life over previous designs
February 16, 2012 Read time: 1 min
High production drilling is claimed whren using Atlas Copco's new T-WiZ drill string system
161 Atlas Copco says that its latest T-thread drilling system offers up to 30% longer service life over previous designs

The new T-WiZ drill string comes with a combination of T-WiZ Speedrods and T-WiZ shank adapters and this system allows fewer rod changes and more productivity/shift. The T-WiZ features a tough thread system and is robust enough to prevent product breakage in the blast hole

Using this system boosts bench and production drilling according to the firm, with increases in productivity and an increase in capacity. The system can drill more holes/shift, allowing quicker blasting and a rapid advance

For more information on companies in this article

Related Content

  • Sandvik the key to Raj Stones crushing success
    May 15, 2014
    Raj Stones, based in Fujairah in the United Arab Emirates, is said to have seen its aggregates production increase through the use of a Sandvik Construction CH660 cone crusher. Guy Woodford reports As an operator of one of the larger quarries in the UAE, Raj Stones has used a wealth of Sandvik technology to help reinforce its position as one of the premier aggregate suppliers in the region, now exporting material to Qatar, as well supplying the growing Emirates construction industry. At the heart of t
  • Material transfer vehicles see advances
    July 9, 2020
    Material transfer vehicles offer a buffer between asphalt trucks and pavers, optimising flow, and new models coming to market offer improved performance
  • Traffic Group launches the portable Evo 1
    June 14, 2022
    Traffic Group Signal’s latest AutoGreen has also been incorporated into the Evo1 as standard and now supports pedestrian crossings.
  • HiLight E3+ joins Atlas Copco tower range
    March 7, 2017
    Atlas Copco has introduced the HiLight E3+ lighting tower, an electric-only LED model that can be plugged into a generator, an auxiliary power source or directly into the mains to provide rapid lighting on site. Up to four HiLight E3+ towers can be powered by a single Atlas Copco iP portable generator.