Skip to main content

Case lightens French traffic

Two new Case CX series excavators played a leading role in a major €1.5 million project to improve traffic flow at the Terres Saint Jean business and shopping park in Épinal, eastern France. Purchased by French firm Peduzzi TP, the CX250C and a CX350C machines are helping to renew the infrastructure, improve traffic flow and safety at the junction with the RN 57. The Épinal town council commissioned works, which began in March 2012, included the construction of an underground passage under the RN 57 linking
February 18, 2013 Read time: 3 mins
Two new 176 Case CX series excavators played a leading role in a major €1.5 million project to improve traffic flow at the Terres Saint Jean business and shopping park in Épinal, eastern France.

Purchased by French firm Peduzzi TP, the CX250C and a CX350C machines are helping to renew the infrastructure, improve traffic flow and safety at the junction with the RN 57. The Épinal town council commissioned works, which began in March 2012, included the construction of an underground passage under the RN 57 linking the two parts of the Terres Saint Jean business and shopping park, making them more readily accessible.

The near six-month job was made more complicated by the different levels of the new access ways, and in particular the passage under the RN 57. Peduzzi TP also had to deal with the 20,000m² of various materials that had to be moved with great precision, due to existing utilities and the creation and modification of the networks.

Peduzzi manager Philippe Vuillemin said the proven reliability and performance of the CX range, respect for environmental standards and its low fuel consumption were all decisive factors in his choice of equipment.
“The new CX series C excavators lived up to all our expectations at Épinal. They have higher lifting capacity and digging power and shorter cycles. All these qualities helped to boost our productivity," explained Vuillemin.

The drivers of the two new CX series C excavators at Peduzzi TP are said to have quickly realised that fuel consumption was significantly lower than that of the preceding models.

"When we filled up with fuel, we soon realised that consumption is lower than that of the other CX machines in our fleet. Consumption has been cut by about 50litres per working day. When you think that the tank holds 300litres on average, that really counts," said Samuel Petitjean, one of the two new CX series C excavator drivers used on the project.

The CX series C excavators are fitted with an interim Tier 4 engine with reduced emissions that is said by Case to offer greater efficiency and lower fuel costs.

The engine complies with the regulations applying to pollutant emissions thanks to the cooled exhaust gas recycling system (CEGR) and a diesel particulate filter.

Productivity is optimised by the automatic regeneration system in the diesel particulate diffuser (DPD).

"Maintenance has also been made easier by grouping the fillers and filters together, and by extending the time between engine oil changes to 500 hours and a full 5,000 hours between hydraulic oil changes," added Petitjean.

Peduzzi drivers were said to appreciate the comfortable cab and the redesigned controls.

For more information on companies in this article

Related Content

  • Carry on Movin’ On - Michelin’s mobility event
    October 15, 2018
    Many of the great and the good in the global mobility sector gathered at this year’s Movin’ On event in Montreal. Measured regulation of technologies and safety issues were major themes, reports David Arminas Autonomous vehicles, platooning, smart intersections and safety – these were the talking points over two and half days of the Movin’ On event in Montreal. Everyone in the mobility sector is at the same point, trying to see what mobility will look like in the future. Apparent at the event was just
  • Increased performance from Komatsu’s new WA500 wheeled loader
    February 12, 2013
    Komatsu says that its new WA500-7 wheel loader offers improved efficiency and lower fuel consumption, as well as increased output. Weighing in at 333tonnes, the WA500-7 has improved operator comfort with a larger and more spacious cab fitted with ergonomic controls and offering better visibility.
  • Morocco’s new motorway links are boosting connectivity
    December 16, 2014
    Morocco’s massive motorway construction programme will improve transport connections and boost this North African country’s economy - Mike Woof reports A massive road building programme is transforming Morocco, with new motorways connecting cities and major towns, as well as many new rural roads being built. The Moroccan Government has set an impressive plan for its infrastructure investment that will see even the country’s small and remote villages having proper connections to the main road network. The
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc