Skip to main content

Tunnel project in Poland

Spanish contractor OHL and Polish company Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland.
March 2, 2012 Read time: 1 min
RSSSpanish contractor OHL and Polish company 3206 Hydrobudowa are now working as a consortium on plans for a new tunnel project in Poland. The project involves the construction of a new road tunnel in the city of Gdansk and, including road connections, is worth some €172.05 million. To carry out the work the consortium is ordering a new tunnel boring machine (TBM) from German supplier Herrenknecht, worth €20.80 million. Included in the TBM order is sand separation equipment, with this machinery scheduled for delivery by September 2012 at the latest.

For more information on companies in this article

Related Content

  • Topcon unveils web-based construction management tool
    January 6, 2017
    Topcon is introducing Enterprise3D, a subscription web-based construction and engineering management tool which aids complete job site planning and scheduling. Reports from and to the system can be sent via Topcon’s sitelink3D.net web portal from anywhere in the world.
  • Topcon unveils web-based construction management tool
    April 17, 2013
    Topcon is introducing Enterprise3D, a subscription web-based construction and engineering management tool which aids complete job site planning and scheduling. Reports from and to the system can be sent via Topcon’s sitelink3D.net web portal from anywhere in the world.
  • New road tunnels are planned for Switzerland
    July 24, 2012
    Two key tunnel projects are being planned in Switzerland at present, for projects at Jura and Gothard. The Swiss Federal Department for Infrastructure Uvek now intends to build a third tunnel at Jura Mountain by 2022. This will be the third link for Motorway 2 and will be completed before renovation work is carried out on the two existing tunnels. The new link will provide four lanes and ensure traffic flow continues while the existing links are improved. The construction of the third tunnel is expected to
  • VF Venieri enters the fray with its 19tonne wheeled loader
    January 6, 2017
    VF Venieri has diversified from its traditional range of smaller machines to launch the 18-63, a 19tonne, 3.5m3 wheeled loader. Though this is the most widely sold type of machine in the world, Venieri believes its new machine can forge a place for itself, according to managing director Filippo Muccinelli.