Skip to main content

New Hoover Bypass Bridge complete

Work on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed.
February 29, 2012 Read time: 1 min
RSSWork on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed. The bridge forms part of the Hoover Bypass, a project worth some US$240 million.

This new bypass route replaces the highly congested US Route 93, a two-lane road running along the top of the Hoover Dam itself. This route has been unable to cope with the increased volumes of traffic and long queues of vehicles have formed at peak periods, especially since the terrorist attacks on the US in 2001, due to the need for security checkpoints. Heavy trucks have also been forbidden from using the US95 link over the dam and have had to take alternative routes.

Related Content

  • Approval for UK road contract
    March 3, 2023
    Approval has been given for an important UK road contract.
  • Funds agreed, further funds sought for Paraguay road and bridge projects
    May 13, 2014
    Paraguay's Ministry of Public Works and Communications (MOPC) has requested a US$289.45 million donation from the Mercosur Structural Convergence Fund (Focem) for the second stage of the Costanera road project (Costanera II) and a second bridge connecting the country to Brazil. Of this total, around $117.44 million will be allocated to works on Costanera II. This is higher than the initial estimate of $100 million, with 60% covered by Focem and 40% financed by a local counterpart. The bridge, which will req
  • Massive funding packages for two crucial US bridge replacement works
    December 20, 2023
    Funding packages will help pay for two major bridge replacement works in the Eastern US and Western US.
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-