Skip to main content

New Hoover Bypass Bridge complete

Work on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed.
February 29, 2012 Read time: 1 min
RSSWork on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed. The bridge forms part of the Hoover Bypass, a project worth some US$240 million.

This new bypass route replaces the highly congested US Route 93, a two-lane road running along the top of the Hoover Dam itself. This route has been unable to cope with the increased volumes of traffic and long queues of vehicles have formed at peak periods, especially since the terrorist attacks on the US in 2001, due to the need for security checkpoints. Heavy trucks have also been forbidden from using the US95 link over the dam and have had to take alternative routes.

Related Content

  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • New ADTs offer low emissions performance and fast cycle times
    December 2, 2014
    Its incredible versatility means that the articulated dumptruck (ADT) has become a popular piece of equipment for quarrying or earthmoving applications. For quarrying in particular, the machines are highly useful as they are able to cope with steeper ramp hauls and tougher terrain than rigid haulers offering similar payloads.
  • Toll-tale market strength for leading tolling manufacturers
    May 22, 2014
    New major highway tolling solution supply contracts and the launch of cutting-edge tolling products have invigorated the global tolling technology market in the first half of 2014, as Guy Woodford reports Kapsch TrafficCom has been selected by North Tarrant Express (NTE) Mobility Partners LLC to provide the toll collection, intelligent transport and network communication systems for the NTE extension project in the US state of Texas. The NTE extension is approximately 16km long, and runs along I-35W north o