Skip to main content

New Hoover Bypass Bridge complete

Work on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed.
February 29, 2012 Read time: 1 min
RSSWork on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed. The bridge forms part of the Hoover Bypass, a project worth some US$240 million.

This new bypass route replaces the highly congested US Route 93, a two-lane road running along the top of the Hoover Dam itself. This route has been unable to cope with the increased volumes of traffic and long queues of vehicles have formed at peak periods, especially since the terrorist attacks on the US in 2001, due to the need for security checkpoints. Heavy trucks have also been forbidden from using the US95 link over the dam and have had to take alternative routes.

Related Content

  • Cost increases for major Chilean highway project
    November 15, 2013
    The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
  • China highway projects awarded to major contractors
    June 29, 2017
    A series of large highway projects have been awarded to major construction firms in China, following agreements with the authorities in Shaanxi. New highways will be constructed by China Gezhouba Group Corp (CGGC) to link Tingchang with Huang Long and Ningshaan with Shiquan.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.