Skip to main content

New Hoover Bypass Bridge complete

Work on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed.
February 29, 2012 Read time: 1 min
RSSWork on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed. The bridge forms part of the Hoover Bypass, a project worth some US$240 million.

This new bypass route replaces the highly congested US Route 93, a two-lane road running along the top of the Hoover Dam itself. This route has been unable to cope with the increased volumes of traffic and long queues of vehicles have formed at peak periods, especially since the terrorist attacks on the US in 2001, due to the need for security checkpoints. Heavy trucks have also been forbidden from using the US95 link over the dam and have had to take alternative routes.

Related Content

  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Nigeria’s East-West route faces delays
    June 22, 2017
    Construction of the important East-West highway in Nigeria now looks to face serious delays.
  • North Carolina road widening contract for Ferrovial
    August 31, 2022
    Ferrovial will work on a key North Carolina road widening contract.
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev