Skip to main content

Temporary ProLight solar lighting illuminates the UK’s A14 upgrade

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting. The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.
January 9, 2019 Read time: 2 mins
Prolectric ProLight tower solar lighting with powerful LED illumiation

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting.

The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.

A total of 24 Prolectric ProLight tower solar lighting with powerful LED illumination are deployed at the three compounds along the construction route, illuminating site operations.The ProLights illuminate two newly-constructed permanent roundabouts, enabling works traffic movements and site safety until permanent street lighting is introduced. Further lights are illuminating temporary bridges and laydown areas to enable safe loading and offloading of construction materials. The trailer-mounted battery capacity has been developed to be three times that of any other temporary solar trailer lights. On winter days with 16 hours of darkness the unit operates consistently.

A saving of 264,000kgs of CO2, 98,800 litres of diesel and just over €90,000 of manpower costs have been achieved in the past year. Using temporary solar lighting wherever possible will also save more than 1,000 tonnes of CO2 over the course of construction, explained David Bray, Highways England project director.

All ProLight solar units used on the A14 have been fitted with an upgrade that enables the works team to power 1800W hand-tools with the solar energy generated and stored in the light’s battery system.  

The enhancement has increased the team’s ability to reduce carbon impact, as well as removing the noise and fumes of diesel generators.

The lights are fitted with a micro-controller and GPS that enables on and off times to be controlled automatically. Power usage and carbon savings data can be monitored and recorded via a web portal.  

Although all customers have real-time web access to a remote monitoring service, Prolectric can also provide daily monitoring and control to optimise the performance of each unit, as well as regular reports of a range of performance data including carbon savings.

Related Content

  • SafeZone from Siemens ITS delivers safer roads in Sussex, UK
    May 18, 2018
    Two SafeZone average speed schemes installed by Siemens in Brighton and Hastings, UK, are recording almost 100% speed compliance. The cameras have been deployed along the seafronts at Brighton and Hastings. The schemes use a combination of visible and invisible infrared lighting which is more sensitive to the effects on local residents and the environment. It’s the first time such schemes have been installed in the county. “Using a collection of cameras along Brighton seafront on Marine Parade and a furt
  • Euromarket stable until 2020, predicts Euroconstruct
    December 13, 2018
    Analysts predict strong growth in road building up to 2020 as public finances improve. Graham Anderson reports from Helsinki European civil engineering markets – including road building and maintenance - are predicted to grow strongly between now and 2020 thanks to the increasing strength of EU members states’ national economies. The increasingly optimistic forecasts are contained in the latest construction industry research from construction market analyst Euroconstruct, based in the Finnish capital Hel
  • Big measuring from TinyMobileRobots
    February 27, 2017
    Small is beautiful, especially when it comes to robots, explains Jens Peder Kristensen, director of Danish company TinyMobileRobots With the increased functionality of outdoor robots, the market for autonomous robots as a replacement for human work has widened. The human touch is still needed when dealing with terrain that is difficult to navigate or with a crowded construction site.