Skip to main content

Safer with 3i Innovation’s lighting for Mount Victoria Tunnel

In New Zealand, 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.
January 6, 2017 Read time: 2 mins
3i in Wellington’s Victoria Tunnel

In New Zealand, 151 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.

The 85-year-old State Highway 1 tunnel is a part of the route from Wellington Airport to the rest of the country’s North Island. It also connects the eastern suburbs to the central city and beyond. The extensive upgrade started in April 2015 and was completed in June.

Upgrade includes energy efficient LED 'intelligent' systems. Lights dim and brighten at the portals in response to outdoor light.

Conditions for driving through the tunnel have been improved with 1,000 light-reflecting white panels beside the carriageway, a new paint palette and inductively powered LED road markers along the sides and centreline. The panels are fire-resistant, adding to the tunnel’s safety profile.

The LED road delineators - are electronically programmed to pulse and strobe in sequence toward the exits in an emergency, guiding people safely out. The system is a world-first use of delineators to this extent, according to the agency.

3i’s work on the project included the supply and commissioning of 124 Tunnel Guidance Markers, 64 Tunnel Lane Markers and associated power supplies - 2x IPL1200i and 1x IPH2000i – along with customised firmware for the emergency modes.

The Tunnel Lane Markers in the centre line provide greater safety through stronger delineation and alignment - critical for the management of bi-directional tunnels, says 3i.

During normal conditions the markers are on standby at a dimmed light output. In the event of an emergency the markers will turn on and cascade towards the safest exit to guide pedestrians out of the tunnel.

Emergency mode activation causes the LED road and edge markers to cascade towards the nearest safe exit.

The tunnel has also been repainted inside and out with a colour scheme that features light blue inside the portals and along the walkway, soft white on the lower walls and new carriageway wall panels, as well as black on the ceiling.

For more information on companies in this article

Related Content

  • Philadelphia’s iconic bridge being upgraded
    April 16, 2020
    Philadelphia’s iconic Benjamin Franklin Bridge is being upgraded.
  • Indra tech to boost safety on Colombia highway
    August 2, 2019
    Indra is to supply traffic management technology, communications and toll systems to the Bucaramanga-Barrancabermeja-Yondó highway in Colombia, in a deal valued at €10.5 million. The company says its line of Mova Traffic solutions will manage the 152km roadway, which unites the Santander department in the Andes mountains with the country's main oil production centres. Indra’s Horus integrated traffic and tunnel management platform is expected to provide operators with real-time information of everyt
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."