Skip to main content

No turning around for Gateshead with Signstr8 anti-rotational posts

The northern English city of Gateshead has adopted Signstr8 anti-rotational sign posts from SignPost Solutions to help reduce maintenance costs. Gateshead has specified Signstr8 for all of its steel post sign installations where strength capacity allows. As opposed to standard round poles, the 76mm diameter steel Signstr8 pole has a 30mm flat face to prevent the sign from being misaligned or rotated. The design avoids the need for costly call-outs to ensure signs are correctly orientated. They can prevent
April 4, 2018 Read time: 2 mins
Signstr8 anti-rotational sign posts are keeping travellers in Gateshead on the right track
The northern English city of Gateshead has adopted Signstr8 anti-rotational sign posts from 2439 SignPost Solutions to help reduce maintenance costs.


Gateshead has specified Signstr8 for all of its steel post sign installations where strength capacity allows. As opposed to standard round poles, the 76mm diameter steel Signstr8 pole has a 30mm flat face to prevent the sign from being misaligned or rotated.

The design avoids the need for costly call-outs to ensure signs are correctly orientated. They can prevent unnecessary and costly disputes as the signs are always facing the right way.

Trevor Waggett, engineering manager at Gateshead Council, said that his team had previously purchased tubular and square poles for different applications. “With Signstr8, however, multiple applications can be accommodated which simplifies and streamlines the procurement process, reduces order times and prevents stocking issues.”

The patented Signstr8 anti-rotational sign post accepts standard clips, base plates and external caps. It complies with passive safety standards because the moment capacity is significantly lower than that of a standard 89mm x 3.2mm S355 grade steel post, according to the manufacturer.

Designed to BS EN 12899 and precision rolled to EN 10305-3, the posts are available as galvanised (to ISO 1461), PVC coated (grey or black), painted and more recently in aluminium 76mm and 89mm diameters.

For more information on companies in this article

Related Content

  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Help is on the way: RoadResource.org
    November 29, 2018
    RoadResource.org as a go-to website for surfacing information is now live, explains Doug Hogue, of VSS Macropaver When RoadResouce.org went live – quietly - in July it was the end of two years of hard work by three US associations for pavement preservation. But there was no grand party or ceremonial pushing of the “go live” button, says Doug Hogue, vice president and general manager of VSS Macropaver. “For all of us in the industry July is a busy period that left little time to celebrate on the ope
  • Beijing airport runway features novel asphalt solution
    December 7, 2017
    Beijing ranks amongst the five busiest airports across the globe and its runway surfaces face tough stresses as a result. Over 94 million passengers flew through Beijing Capital Airport (BCA) in 2016 and as many as 70 flights/hour can take off and land during peak times. The 60m-wide middle runway of Beijing Capital International Airport is the busiest of the three runways, with a landing and take-off flight ratio of up to 40%. This runway was first rehabilitated in 1996 and then repaired in 2013 and 2015