Skip to main content

No turning around for Gateshead with Signstr8 anti-rotational posts

The northern English city of Gateshead has adopted Signstr8 anti-rotational sign posts from SignPost Solutions to help reduce maintenance costs. Gateshead has specified Signstr8 for all of its steel post sign installations where strength capacity allows. As opposed to standard round poles, the 76mm diameter steel Signstr8 pole has a 30mm flat face to prevent the sign from being misaligned or rotated. The design avoids the need for costly call-outs to ensure signs are correctly orientated. They can prevent
April 4, 2018 Read time: 2 mins
Signstr8 anti-rotational sign posts are keeping travellers in Gateshead on the right track
The northern English city of Gateshead has adopted Signstr8 anti-rotational sign posts from 2439 SignPost Solutions to help reduce maintenance costs.


Gateshead has specified Signstr8 for all of its steel post sign installations where strength capacity allows. As opposed to standard round poles, the 76mm diameter steel Signstr8 pole has a 30mm flat face to prevent the sign from being misaligned or rotated.

The design avoids the need for costly call-outs to ensure signs are correctly orientated. They can prevent unnecessary and costly disputes as the signs are always facing the right way.

Trevor Waggett, engineering manager at Gateshead Council, said that his team had previously purchased tubular and square poles for different applications. “With Signstr8, however, multiple applications can be accommodated which simplifies and streamlines the procurement process, reduces order times and prevents stocking issues.”

The patented Signstr8 anti-rotational sign post accepts standard clips, base plates and external caps. It complies with passive safety standards because the moment capacity is significantly lower than that of a standard 89mm x 3.2mm S355 grade steel post, according to the manufacturer.

Designed to BS EN 12899 and precision rolled to EN 10305-3, the posts are available as galvanised (to ISO 1461), PVC coated (grey or black), painted and more recently in aluminium 76mm and 89mm diameters.

For more information on companies in this article

Related Content

  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a
  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o
  • Work to start on Tyne Bridge refurbishment
    March 11, 2024
    In the UK, Esh Construction was appointed by Newcastle and Gateshead councils in June 2022 to carry out the €48.5 million programme of repairs.