Skip to main content

Murphy Plant goes green with Trime X-Eco LED light towers

Murphy Plant, a rental company in England, has expanded its fleet with the purchase of 45 X-ECO LED lighting towers from Trime UK. The units delivered to Murphy Plant are dressed in the company’s “Murphy green” livery and are ready to be sent to sites throughout the country. Murphy Plant offer everything from small electrical drills to a 135tonne crawler crane, or even specialist equipment within rail, pipelines, tunnelling, marine or ground engineering. Trime has calculated that the X-ECO LED uses nearl
January 9, 2019 Read time: 2 mins

Murphy Plant, a rental company in England, has expanded its fleet with the purchase of 45 X-ECO LED lighting towers from Trime UK.

The units delivered to Murphy Plant are dressed in the company’s “Murphy green” livery and are ready to be sent to sites throughout the country.

Murphy Plant offer everything from small electrical drills to a 135tonne crawler crane, or even specialist equipment within rail, pipelines, tunnelling, marine or ground engineering.

Trime has calculated that the X-ECO LED uses nearly €380 less in fuel each month compared to many traditionally illuminated lighting sets. Also, its sturdy, robust design withstands the rigours of the rental market, said Mike Carpenter, director of Murphy Plant. Meanwhile, critical power supply specialists WB Power Services, based in northern England, has bought 20 of the Trime X-ECO LED towers. The purchase is part of the company’s first venture into the temporary site lighting hire market, said John Campbell, WBPS Hire sales manager.

Related Content

  • Advances in electric vehicle technology becoming increasingly competitive with internal combustion engine-powered competition
    April 11, 2012
    According to a new report from consultant Frost & Sullivan, extended-range electric vehicles (EVs) could be cost-competitive with comparable internal combustion engine (ICE) vehicles as soon as 2015. The report claims that electric vehicles could offer a payback period of less than four years for customers with an oil price of €2.50/litre, without any government subsidies.
  • Tarmac’s productivity boost with new software
    August 9, 2018
    A highly sophisticated software system is at the heart of a major boost to productivity and efficiency from contractor Tarmac. The firm is utilising the latest logistics software from Germany to improve its performance. The company is the first contractor in the UK to employ the BPO ASPHALT software developed by Volz Consulting in Germany. This advanced planning and real-time software technology can be utilised to optimise road construction logistics and boost productivity. The software allows Tarmac’s co
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Gubler gets down with a Kemroc EK 100 chain cutter
    May 1, 2018
    Boulders are usually removed from site by breaking them with a hammer and then using a backhoe to extract the rubble: a time-consuming process. Swiss construction company Gubler, however, used a Kemroc EK 100 chain cutter to cut down on processing time as well as wear and tear on company equipment. With an EK 100 chain cutter mounted on their 22tonne excavator, Gubler excavated the foundations, footings and service trenches in the typical local molasse rock. The project is a large residential complex and