Skip to main content

On the level with Intercomp’s LS630-WIM weigh-in-motion system

The system increases facility efficiency by accurately weighing vehicles travelling up to 15km/h. Coupled with the 4.14m-wide weighbridge, nearly any vehicle, including those with a wide load or trailer, can be quickly screened. Intercomp says its weigh-in-motion LS630-WIM system is ideal for high traffic volumes at temporary facilities to monitor axle weight or GVW (gross vehicle weight) compliance. Additionally, the portable system can be used at multiple locations as two people can deploy or stow the s
June 10, 2019 Read time: 2 mins
The system increases facility efficiency by accurately weighing vehicles travelling up to 15km/h. Coupled with the 4.14m-wide weighbridge, nearly any vehicle, including those with a wide load or trailer, can be quickly screened.


1315 Intercomp says its weigh-in-motion LS630-WIM system is ideal for high traffic volumes at temporary facilities to monitor axle weight or GVW (gross vehicle weight) compliance.

Additionally, the portable system can be used at multiple locations as two people can deploy or stow the scale pads, ramps/levellers and output CPU in less than 15 minutes. This makes the dynamic weighing system ideal for avoiding undesirable traffic backups due to weight verification operations.

Two scale pads, four roll-up ramps/levelers and dedicated PT20 WIM CPU, or PC, can fit in the trunk of most full-sized vehicles.

The ramps/levellers keep adjacent axles on plane for optimal results. The system accumulates up to 36 individual axles for gross vehicle weight. It also switches to static mode easily.

For more information on companies in this article

Related Content

  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • Norsenga Bridge undergoes weathering tests
    May 19, 2023
    Norway’s Statens Vegvesen says the wooden truss bridge – opened only in 2017 – will be the subject of a study in conjunction with the Norwegian University of Science and Technology.
  • Picture perfect imaging
    June 18, 2012
    Topcon has produced a new imaging station which, it claims, will dramatically increase productivity when used in two-man auto-tracking or single operator robotic modes. Using prism auto-tracking scanning interface technology the IS-3, when used with Topcon’s RC-4 remote control system, will track prisms up to 1,000m away.
  • Picture perfect imaging
    June 26, 2012
    Topcon has produced a new imaging station which, it claims, will dramatically increase productivity when used in two-man auto-tracking or single operator robotic modes. Using prism auto-tracking scanning interface technology the IS-3, when used with Topcon’s RC-4 remote control system, will track prisms up to 1,000m away.