Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Increased performance from hand-operated compaction machines
    March 14, 2012
    Compact compaction units are delivering increased performance – Mike Woof reports. Competition is tough in the market for non-ride-on compaction units, with two manufacturers now introducing revamped models. Both JCB and Wacker Neuson aim to claim a larger section of the market with their latest designs, compaction plates and remote-controlled trench rollers respectively.
  • Danish days for a Hitachi ZW220-6 wheel loader
    February 6, 2018
    A new Hitachi ZW220-6 wheeled loader has been delivered to Jysk Kloak Entreprise, a sewage and landscaping contractor in Tjæreborg on the coast of Denmark. It is the latest addition to the company’s Hitachi fleet, which includes a ZX250LC-6 medium and three mini excavators , the ZX10U-2, ZX18-3 and ZX27-3. “We needed the most versatile model available for our requirements,” said company owner Jan Christensen. Fitted with additional lights and a larger 4m³ bucket, the wheeled loader was supplied in Februa
  • Eurovia meets the 100% RAP “Recyclee” challenge on a French motorway
    October 25, 2018
    Eurovia says that it has successfully paved a 1km stretch of a French motorway using 100% recycled asphalt pavement – a global first for RAP. Eurovia said that the “fully recycled road”, done in conjunction with its parent company VINCI Autoroutes, is part of a major motorway renovation project on the A10 between Pons and Saint-Aubin in southwest France. The road is the result of two years of research and a partnership with asphalt plant equipment maker Marini-Ermont of the Fayat group. Marini-Ermont
  • Simex machine helps deliver new tunnel lining
    December 1, 2014
    In Italy an MP1000 cutting system from Simex has been used to help resurface the walls of a highway tunnel. The SS51 State Road crosses through the Dolomites in the north-eastern Alpine Region of Italy. The SS51 starts in San Vendemiano in the province of Treviso and ends in Dobbiaco in the province of Bolzano and is a key road because it connects Cadore and the main towns in the area of Cortina d'Ampezzo. This 134.4 km road has expansion work and upgrades to improve safety and boost capacity. One the mo