Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Aecon sells Ontario road business to GIP
    May 18, 2023
    Canadian infrastructure group Aecon has sold its Ontario-based construction and aggregates business Aecon Transportation East to Green Infrastructure Partners.
  • The power of water
    July 18, 2012
    The popularity of hydrodemolition is growing worldwide and was the specified solution for work on two vital Swedish links The hydrodemolition technique, which uses high pressure water jets to remove damaged concrete from various structures, is playing a crucial role in the major restoration of the vital Central Bridge and Söderled Tunnel in the centre of Sweden's capital Stockholm. The 1,550m dual two-lane rectangular box Söderled Tunnel and connecting dual two and three-lane Central Bridge are a vital 2.6k
  • Major tunnel project underway in Bangladesh
    March 1, 2019
    A major tunnel construction project is now underway in Bangladesh, the first tunnel in the country to be constructed under a river.
  • Increased performance from hand-operated compaction machines
    April 13, 2012
    Compact compaction units are delivering increased performance – Mike Woof reports. Competition is tough in the market for non-ride-on compaction units, with two manufacturers now introducing revamped models. Both JCB and Wacker Neuson aim to claim a larger section of the market with their latest designs, compaction plates and remote-controlled trench rollers respectively.