Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Terex TA300 blazes trail for new stretch of D11 Czech motorway
    March 12, 2018
    Workers on a stretch of the Czech Republic’s D11 motorway have found a friend in the Terex TA300 28tonne articulated dump truck. Czech-based company ATM CZ has a two-year contract to extend the 90km D11 by 15.5km; no easy task, from earthwork to compaction and paving. The road connects the Czech capital Prague and the city of Hradec Králové. Once the project is complete, the motorway will continue to Smiřicemi. The motorway is part of European route E67 – the so-called Via Baltica – from Prague to the Fin
  • Wacker Neuson is reporting strong half year results
    August 6, 2019
    Wacker Neuson is reporting strong financial performance for the first half of 2019. The firm says that it continued on its growth path, with revenue climbing 15.2% compared with the same period in the previous year. Revenue hit €950.7 million compared with €825.1 million for the first half of 2019. “The first half of the year showed us once again that our solutions meet the needs of our customers,” explained Martin Lehner, CEO of Wacker Neuson SE. “We gained shares in numerous markets, driven largely by our
  • Melbourne to become a plastic road test bed
    August 30, 2023
    According to RMIT - the Royal Melbourne Institute of Technology - 10 project sites around the Australian city will use an estimated 21,000kg of recycled plastic.
  • St Petersburg city centre to get ‘highway frame’
    August 23, 2012
    Local government leaders in the Russian city of St Petersburg have announced plans for a ‘highway frame’ around the historic city centre. The highway with uninterrupted traffic flow will connect the Primorsky district to Obvodny Canal with an entrance to Western High-Speed Diameter. The project offers to resume bridge construction across the Malaya Neva from Petrogradskaya Storona to Vasilyevsky Island, to reconstruct Obvodny Canal embankments, and to build a highway with a bridge in range of Fayansovaya an