Skip to main content

Kapsch equips Olympia Odos motorway with toll rebate stations

Kapsch TrafficCom has equipped the Olympia Odos Greek motorway with 30 free flow rebate stations. The contract was awarded by the Canadian IBI Group, which has a contract with the Apion Kleos Construction joint venture of Olympia Odos. The deal is for Kapsch’s ongoing technical support for service and maintenance based on a yearly agreement. Kapsch says that the 202km Olympia Odos is one of Greece’s most significant motorway concessions, linking the capital Athens with the city of Corinth and Patras
October 1, 2019 Read time: 2 mins
259 Kapsch TrafficCom has equipped the 3286 Olympia Odos Greek motorway with 30 free flow rebate stations.


The contract was awarded by the Canadian IBI Group, which has a contract with the Apion Kleos Construction joint venture of Olympia Odos. The deal is for Kapsch’s ongoing technical support for service and maintenance based on a yearly agreement.

Kapsch says that the 202km Olympia Odos is one of Greece’s most significant motorway concessions, linking the capital Athens with the city of  Corinth and Patras Port.

The planned upgrade offers the first distance-based pricing model in Greece, available to all electronic toll collection users of Olympia Odos. The solution is based on the concept of providing a rebate to road users if they don’t travel the totality of the distance corresponding to an average distance charging zone (the current charging model). This new model is considered a hybrid or rebate system.

The new solution involves equipping 30 entry and exit ramps with full tolling and enforcement stations for detection and classification of passing vehicles. The journeys recorded by the roadside systems are paired with those recorded in conventional toll plazas to calculate the rebate amount.

For more information on companies in this article

Related Content

  • Dynaweigh’s flashy WiM system
    October 4, 2023

    Batsch Dynaweigh says its truck scales HHB01 and HHB02 for dynamic detection of overloaded vehicles has a legal verifiable accuracy of +/- 1% (class 2D). This meets the requirements of the OIML R134 regulations for automatic instruments for weighing road vehicles in motion and measuring axle loads.

    For Dynaweigh’s popular HHB01 and HHB02 scales – eight years in development – the total weight and axle loads are recorded automatically during crossing at up to 35km/h.

  • Mota-Engil wins Cardel-Poza Rica motorway contract in Mexico
    June 13, 2014
    Mexico's Secretarat of Communications of Transport (SCT) has awarded the contract to build the Cardel-Poza Rica motorway to Portuguese company Mota-Engil. The proposal made by the company, together with PRODI, of US$266.48 million (MXN 3.47 billion), was deemed the most feasible technically and financially. The offer was below the $307.53 million (MXN 4 billion) estimated for the project in the National Infrastructure Plan (PNI). The road will be located in Veracruz, spanning 129km between Laguna Verde and
  • 407 ETR deploys billing and payment web portal
    May 4, 2012
    EbpSource, a provider of high volume e-billing and payment solutions, worldwide has announced its involvement in helping the Canadian Tolling Company International (407 ETR) to go live with a dynamic new customer self-service portal. 407 ETR manages Toronto's 407 Highway, a 108 km barrier-free toll highway that uses video cameras and vehicle-mounted transponders to record an average of 380,000 workday trips which are then processed and billed to customers.
  • Caterpillar smoothens Colombian airport
    August 21, 2013
    Cartagena, Colombia’s coastal city attracts large numbers of visitors, generating heavy traffic through the Rafael Nuñez International Airport. However the surface of the runway had suffered from heavy wear, r esulting in bumpy landings and this was in need of repair. In addition, engineers wanted to create a graded, ramped approach to aid with both take-offs and landings. However, the volume of air traffic using the airport meant that construction work had to take place in a tight timeframe, between mi