Skip to main content

GuidSIGN version 5.0 offers faster sign design

Software specialist Transoft Solutions says that the latest version of the efficient sign design software, GuidSIGN version 5.0. A is both easy to use and versatile. The package can deliver cutter-ready signs designed to standard in minutes according to the firm. The product comes with new features, functions, and added libraries that give traffic engineers efficient, time-saving, productivity-enhancing sign-designing capabilities says Transoft. A key feature is the new QuicDesign template system that suppl
July 24, 2012 Read time: 2 mins
Software specialist 349 Transoft Solutions says that the latest version of the efficient sign design software, GuidSIGN version 5.0. A is both easy to use and versatile. The package can deliver cutter-ready signs designed to standard in minutes according to the firm. The product comes with new features, functions, and added libraries that give traffic engineers efficient, time-saving, productivity-enhancing sign-designing capabilities says Transoft. A key feature is the new QuicDesign template system that supplies national standard templates to help users create signs quickly and with greater consistency. It offers traffic engineers and consultants standardised templates and helps ensure repeatable time-savings. Designers can browse by road classification or sign designation to select the appropriate template. QuicDesign also gives users the ability to replace the content of the template by keying in changes or through the new Name Lookup feature, which can select destinations based on the included American Association of State Highway Transportation Officials (AASHTO) Control Cities or United States Geological Survey (USGS) Place Name Lists. Users can also create templates from previously created guide signs and build a custom library for use in traffic signing plans and structural detail drawings. Sign and content libraries within GuidSIGN have also been augmented to make them more extensive than previous versions. Included are more MUTCD standard highway signs, panels, symbols, and arrows from US, Canada, and Australia.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Berco bounces back
    December 16, 2021
    The global Italian undercarriage manufacturer is forging ahead with a major lean manufacturing transformation that is already seeing results. David Arminas reports from the company’s 500,000m² plant in Copparo.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of