Skip to main content

Traffic management reducing carbon emissions

Three trees provided by Siemens have been planted in Southampton’s prestigious QE2 mile as part of the carbon offset programme included in the new traffic signals maintenance contract awarded to the company by Southampton City Council. Southampton's traffic signal engineer, Martin Wylie said: “We are working with Siemens on a number of initiatives to reduce the carbon emissions associated with our Intelligent Transport Systems.
May 15, 2012 Read time: 2 mins
Three trees provided by 1134 Siemens have been planted in Southampton’s prestigious QE2 mile as part of the carbon offset programme included in the new traffic signals maintenance contract awarded to the company by 3548 Southampton City Council.

Southampton's traffic signal engineer, Martin Wylie said: “We are working with Siemens on a number of initiatives to reduce the carbon emissions associated with our Intelligent Transport Systems.

“The city has secured funding from the Carbon Trust via the fund administrator, 1548 Salix, and is currently deploying low energy LED traffic signals across the city with an estimated reduction in carbon emissions in excess of 400tonnes/year. Southampton is using a combination of low energy products including Siemens ELV technology and LED retrofit solutions.”

The company says its ELV family of environmentally friendly controllers and signals can reduce energy costs and carbon footprint by up to 75%.

A newly-developed LED signal head retrofit option from Siemens enables existing installed Siemens Helios and Peek Elite signal equipment to be upgraded to the latest Siemens CLS LED technology, without compromising functionality and maximising the re-use of existing roadside infrastructure.

For more information on companies in this article

Related Content

  • Innovative earthmovers coming to market
    October 12, 2017
    A wide range of innovative earthmover solutions is now coming to market - Mike Woof writes Generally with major construction equipment exhibitions timed for the second quarter of each year, this is when manufacturers will roll out their latest earthmoving solutions. However 2017 has turned out to be something of an anomaly, with the major firms continuing to unveil new models. Firms have introduced new wheeled loaders, excavators, and dozers, although arguably, some of the most interesting developments
  • Milestone uses cement-free concrete and fossil-free fuel in Oxbridge trials
    November 26, 2021
    Milestone Infrastructure has successfully trialled a cement-free concrete on Histon Road in Cambridge, eastern England. As cement is the main contributor of carbon in standard concrete, removing all cement within the product provides significant environmental benefits.
  • Show me the money at Australian Summit
    September 4, 2012
    The question of how to finance and fund major road infrastructure projects in Australia – including the potential role of user-pays charging as a funding solution – was top of mind at the recent Roads Australia National Summit in Sydney. The two-day summit, organised by peak national body Roads Australia, is the largest and most influential annual gathering of industry decision-makers in the country. This year’s summit was held against a backdrop of concern over the future of a raft of major road projects t
  • Drum steer compactors introduced
    April 6, 2023
    One notable development at bauma 2022 was the introduction of new drum steer compactors by several key manufacturers