Skip to main content

Texas highway underway

Work is now well underway on the new North Tarrant Express project in Texas.
February 23, 2012 Read time: 1 min
Work is underway on the new north Tarrant Express project in Texas
Work is now well underway on the new North Tarrant Express project in Texas. Clearance operations are being carried out to make way for the North Tarrant Express, a project that consists of a series of major improvements to the I-820 and SH 121/183 (Airport Freeway) highway corridor in northeast Tarrant County. The US$2 billion project is due to be completed in 2015. This project is intended to help reduce traffic congestion, improve safety and increase capacity in one of the country's fastest-growing regions. In addition to the design, right of way and utilities, the project will rebuild and expand 13 miles along I-820 and SH 121/183 from I-35W to the SH 121 split. This project will rebuild the existing four to six main lanes, add four toll-managed lanes, plus frontage roads and auxiliary lanes to double existing capacity. The project also includes two additional non-tolled main lanes which will also be added no later than 2030 at no additional cost. This PPP is using a combination of private funds with public funds to complete the 21km corridor in five years.

Related Content

  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • The GRSF: breaking down barriers
    December 17, 2020
    Improving road safety can be expensive, especially for low- to middle-income countries. The Global Road Safety Facility has been working hard to alleviate the situation
  • Intermat Middle East positions itself for growth
    October 17, 2012
    As the United Arab Emirates gears up to invest more than US $4.6 billion (UAE Dirham 17 billion) in its nationwide road network in the next few years, the second annual INTERMAT Middle East show has taken place in Abu Dhabi with suppliers like AAA Cranes, Miller UK, Kanoo, Liebherr, Sennebogen, WireCo World, Erkat, Terex Finlay, Atlas Copco, , ELSA SRL, Robit Rock Tools, Ramtec Robi, Scheuerle Fahrzeugfabrik, T.G.S – The Grab Specialist, BV Beco, Techking Tires, Blastrac, SK Solutions, Xcentric Internationa
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.