Skip to main content

Telvent wins Brisbane ITS contract

Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia. Legacy Way is a 4.6km road tunnel that will connect Brisbane’s western and inner northern suburbs, delivering travel time savings of up to 44 per cent when it opens. The ITS contract is valued at around US$32 million.
May 3, 2012 Read time: 2 mins
RSS3344 Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia. Legacy Way is a 4.6km road tunnel that will connect Brisbane’s western and inner northern suburbs, delivering travel time savings of up to 44 per cent when it opens. The ITS contract is valued at around US$32 million.

Brisbane’s metropolitan area has seen strong population growth over the past decade. As the region continues to grow, it continues to put pressure on Brisbane’s already congested road network. Legacy Way completes the missing link of motorway standard road between Brisbane’s Centenary Motorway and the Inner City Bypass (ICB).

The Legacy Way project will deliver long-term benefits including reducing congestion on surface roads and cutting through traffic on local streets, enhancing the region’s pedestrian and cycle networks and providing a direct, reliable, high-speed route between the Western Freeway and the airport.

Telvent will install its SmartMobility Road Suite, based on its own supervisory control and data acquisition (SCADA OASyS), which allows centralisation of tunnel infrastructure and traffic management and provides operators with a set of effective tools to facilitate the process, while improving safety and security at the same time. The solution will enable traffic operators to control traffic in real time and be prepared to respond quickly and effectively to any incident or emergency situation occurring within the tunnel, once it opens.

“We are pleased to have the opportunity to work with Transcity JV on the Legacy Way project, which will lead to better traffic flow management in the Brisbane metropolitan area,” stated Ignacio Gonzalez, Telvent´s chairman and CEO. “This project will assist local authorities in their commitment to optimize urban mobility in the interests of creating a safer and more pleasant environment for citizens, thereby improving their quality of life”.

For more information on companies in this article

Related Content

  • GRAA WINNER PROFILE: Dubai Traffic Accident Blackspot System Analysis
    June 2, 2020
    Dubai’s Road and Transport Authority’s (RTA) vision is “Safe and Smooth Transport for all”. With this in mind, it initiated a special project, together with an international consultant, to further improve traffic safety on its roads by enhancing the methods of treatment of blackspot locations based on best international practice.
  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains
  • Stantec wins upgrade to Florida SR 91
    July 29, 2019
    Canadian contractor Stantec is to lead design work for a 16km upgrade and widening of State Road 91 in the US state of Florida. Work will turn the section of road through Lake County into price-managed lanes for improved travel reliability, according to the company which will be working for Florida’s Turnpike Enterprise, part of the Florida Department of Transportation. Turnpike Enterprise operates a 740km-system of limited access toll highways Stantec’s design for the project, with a construction cos