Skip to main content

Swarco signs for slower Swansea speed limit

In March, the Welsh government passed a law which from September will see the default speed limit on restricted roads in Wales reduced from 30mph (50kph) to 20mph (32kph).
By David Arminas June 30, 2023 Read time: 2 mins
The signs are all being manufactured and rigorously tested at Swarco’s factory in Melsonby in the English county of North Yorkshire (image courtesy Swarco UK & Ireland)

Swarco has signed an agreement with the Welsh city of Swansea to design and install signage to support the new 32kph (20mph) urban speed limit.
 
In March, the Welsh government passed a law which from September will see the default speed limit on restricted roads in Wales reduced from 30mph (50kph) to 20mph. To support the upcoming changes to the speed limit, local authorities in Wales are working to make the necessary alterations to existing highway signage to ensure drivers are aware of the changes.
 
Following an open competitive tender process on Sell2Wales in late 2022, Swansea Council entered into a commercial contract with Swarco to replace its existing vehicle speed activated signs (VAS) with new electronic sign units that dynamically display the approaching vehicle’s actual speed. These signs will display the vehicle speed in ‘GREEN’ if the vehicle is complying with the new default speed limit and in ‘RED’ if not. This new contract is designed to work in co-ordination with an existing service and maintenance contract which was already in place.
 
The new agreement will see Swarco install 120 bespoke vehicle activated signs throughout Swansea. The signs, which are all manufactured and rigorously tested at Swarco’s factory in Melsonby in the English county of North Yorkshire, feature Swarco’s EPIX lens technology system to ensure the lowest power consumption.
 
The signs use a radar to detect vehicle speeds and use an energy efficient LED display to clearly show messages to oncoming drivers, as well as being equipped with highly intelligent internal data logging, which is stored within the signs, to provide statistical feedback and data on the number of activations, vehicle speeds and volumes. The council will be able to easily monitor changing driver behaviour.
 
“We are pleased to further extend our working relationship with Swansea Council,” said Derek Williamson, business development manager at Swarco UK & Ireland. “We have worked closely with them to fully understand their requirements and have designed a high quality, reliable, durable and energy efficient solution that delivers a low lifetime cost.”

For more information on companies in this article

Related Content

  • Cummins sets new quarterly trading record in strong growth period
    November 6, 2023
    Cummins has set a new quarterly net cash from operating activities record of US$1.5bn, a huge rise on the $382mn in Q3 2022.
  • Road accident database vital for road safety
    February 16, 2012
    In the last of our profiles of laureates of the inaugural Innovation Award for Road Transport in Developing Countries (InARoaD), we meet the winner of the Road Safety category, and third prize overall
  • Road accident database vital for road safety
    April 12, 2012
    In the last of our profiles of laureates of the inaugural Innovation Award for Road Transport in Developing Countries (InARoaD), we meet the winner of the Road Safety category, and third prize overall A vital prerequisite for achieving safer roads is thorough assessment of prevailing traffic situations and identification of associated factors. In this respect, the availability of a comprehensive road accident database is crucial for understanding the pattern of accident causation. Conscious of the ne
  • Mobile Visual Information Systems’s DATEX on the A14 in the UK
    November 7, 2017
    Highways England has deployed an intelligent transport system that uses portable message signs to display real-time journey information from the National Traffic Operations Centre (NTOC). Mobile Visual Information Systems’s DATEX allows an average of 85,000 drivers daily on a 34km section of the A14 Cambridge-to-Huntingdon upgrade scheme to navigate roadworks. The scheme includes a new bypass, junction improvements, highway widening and creation of access road. The A14 Integrated Delivery Team, on behalf