Skip to main content

Singapore's key route upgrade

Singapore's Land Transport Authority (LTA) is going ahead with plans to upgrade the Pan Island Expressway (PIE).
February 14, 2012 Read time: 1 min
2652 Singapore's Land Transport Authority (LTA) is going ahead with plans to upgrade the Pan Island Expressway (PIE). Two sections of the existing route will be widened, boosting capacity and improving traffic flow at peak periods. The project calls for extra lanes to be added in either direction to the sections of the road experiencing most congestion at present. One of the sections is between the Bukit Timah Expressway (BKE) and the Adam Road exit, while the other runs from the Clementi Avenue 6 exist to the BKE. The US$63 million project will be carried out by contractor Hwang Seng Builder, which will commence working on the upgrade in July-December 2011 and complete the work by 2014.

For more information on companies in this article

Related Content

  • Budget set for Zimbabwe highway deal
    November 12, 2018
    The budget has been set at US$693 million for the Zimbabwe’s highway running between Harare, Masvingo and Beibridge.
  • Australian award
    November 27, 2012
    Two major awards have been given to the Gateway Upgrade Project in Queensland, Australia. One of these was for engineering excellence while the other was the overall RW Hawken Award. These were given as part of the Engineering Australia Awards (Queensland Division) scheme. Following this, the Gateway Project will now be a contender for the national Australian Engineering Excellence Awards being held in November 2012. The Gateway Upgrade is of note as it is one of the largest road and bridge projects ever ca
  • Major Central American infrastructure projects
    February 23, 2012
    Mexico and Central America are home to some of the world's most spectacular infrastructure projects as Patrick Smith reports
  • 3D GPR technology makes for speedy surveys
    August 21, 2019
    Traffic-speed surveys using 3D ground penetrating radar (GPR) are slashing the time required for surveying the UK’s motorways, and allowing a more thorough analysis of the pavement layers and condition.