Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • New US$341.2mn Polish motorway construction contract awarded to Impreglio
    February 6, 2013
    Italian civil engineering company Impregilo, through Poland-based subsidiary Salini Polska, and Polish firm Kobylarnia has been awarded a US$341.2 million (€250mn) contract to build a stretch of Poland’s A1 motorway. The near 75km route will link the towns of Torun and Strykow, and is expected to be completed within a year.
  • Norwegian tunnel developments with EVs
    March 1, 2021
    Norwegian tunnels will become less costly due to EVs.
  • Colombia sets out major strategy for highway investment
    January 19, 2015
    International interest is strong in Colombia’s infrastructure expansion. Five foreign firms are competing in the country’s 4G road tender process. Fomento de Construcciones y Contratas (FCC), Sinohydro, Sacyr, Tradeco and ICA are amongst the companies competing for 10 contracts worth some US$5.88 billion. The first project opening for tender on 19th May 2015 will be for the Puerta de Hierro-Carreto-Palmar de Varela and Carreto-Cruz del Viso routes. The final tender documents for the 10 projects are being pu