Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • Chile-Argentina tunnel – financing secured
    August 23, 2018
    Financing now looks to have been fully secured for the Agua Negra tunnel project that will connect Chile and Argentina. The two countries have come to an agreement over how much they will contribute to the project, which is expected to cost around US$1.5 billion to construct. The financial contribution from each country will be in proportion to the length in each territory. With 28% of the 14km tunnel in Chile and 72% in Argentina, the latter will now provide the majority of the financing. The new tunnel
  • US road safety issue for vulnerable road users
    March 1, 2019
    Vulnerable road users face risks in the US. While road fatalities are falling overall in the US, pedestrians and cyclists have seen an increase in road deaths in recent years. Driver fatalities have dropped from 27,348 in 2006 to 23,611 in 2017. However, road deaths for pedestrians and cyclists have increased from 5,567 in 2006 to 6,760 in 2017. Poor attitude by US drivers is thought to be a key factor. Aggressive behaviour behind the wheel and driver distraction, particularly with the use of cellphones,
  • Slovakia’s Ruzomberok bypass and tunnel face severer delays
    September 4, 2017
    The bypass around the Slovakian town of Ružomberok, which was supposed to be finished this summer, faces a delay of more than four years. The bypass is part of a 15.2km stretch of the D1 highway between Hubová and Ivachnová. Ružomberok, with a population of around 45,000 including its surrounding area, is in the Liptove region in northern Slovakia. It lies around 260km from the Slovakian capital Bratislava.
  • New Genoa bridge project underway
    October 18, 2019
    Work is continuing in the Italian city of Genoa on the massive bridge replacement project. The 50m sections of the new bridge deck are now being raised into place using heavy lifting cranes. The deck sections weigh around 500tonnes apiece and measure 50m long, with 18 of these components being required in all. The bridge replacement work is necessary following the horrific collapse of the old Morandi Bridge during 2018, which involved multiple fatalities. The new bridge was designed by Renzo Piano and the w