Skip to main content

Safety improvements for UK’s level crossings

As part of a recent rail investment package, the Department for Transport has ring-fenced a US$100 million fund for safety improvements to level crossings between 2014 and 2019, and Optex has announced that its Redscan laser detector has been specified as part of a new solution to automate signalling and detect whether or not a level crossing is clear from vehicles and pedestrians before allowing a train to pass through.
July 27, 2012 Read time: 2 mins
RSSAs part of a recent rail investment package, the 5432 Department for Transport has ring-fenced a US$100 million fund for safety improvements to level crossings between 2014 and 2019, and Optex has announced that its Redscan laser detector has been specified as part of a new solution to automate signalling and detect whether or not a level crossing is clear from vehicles and pedestrians before allowing a train to pass through.

Following nearly two years of testing, TEW Plus, a supplier of specialist CCTV and security products, has achieved full 4139 Network Rail Product Approval for its level crossing obstacle detector using the Redscan as the core detection element. The complete MCB-OD Level Crossings solution incorporates Lidar as the complimentary obstacle detector (COD) working alongside Radar and CCTV surveillance equipment. The solution will be rolled out to more than 400 level crossings over the next five years.

In separate news, Network Rail is to install a spoken-word warning system at 63 level crossings, starting in the York/Selby area. Instead of a two-tone alarm, a spoken announcement will warn if another train is approaching. The Rail Safety and Standards Board has advised that voice messages should improve awareness, instead of relying solely on alarms.

For more information on companies in this article

Related Content

  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Siemens maintenance of highways contracts
    February 19, 2013
    Siemens has won new traffic signal maintenance contracts from four highways authorities in the Midlands of England. The contracts cover Nottingham, Coventry, Warwickshire and Solihull. The contracts will run for five years and cover the maintenance of more than 400 traffic signal junctions, traffic equipment at nearly 550 pedestrian crossings and all ancillary equipment and minor civil works linked with maintaining the traffic signal equipment. The works also include the maintenance of 86 car park variable
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl