Skip to main content

Russian road deals

A notable partnership deal looks set to provide funding for key Russian highway projects. A memorandum of co-operation has been signed between the state-owned Russian Highways (Avtodor) and the European Bank for Reconstruction and Development (EBRD).
February 24, 2012 Read time: 1 min
A notable partnership deal looks set to provide funding for key Russian highway projects. A memorandum of co-operation has been signed between the state-owned Russian Highways (Avtodor) and the 1166 European Bank for Reconstruction and Development (EBRD). Under this deal the EBRD may provide loans to Avtodor, redeem bonds, or co-operate on concession agreements. This funding stream will allow Avtodor to implement its key PPP projects. Avtodor and the EBRD have been discussing the highway linking Moscow with St Petersburg as well as the reconstruction of the M4 Don road. By 2019, Russia plans to have invested around ?33 billion (US$47.4 billion) to develop its national transportation system, with a significant proportion being provided by private investors. However, some analysts have criticised plans for Moscow's Central Ring Road, proposed by Avtodor. The original plan was to construct the 521km toll road 50-60km from Moscow, although work has not yet commenced on the project. Some ?5.8 billion ($8.36 billion) will be required as investment in the project by 2015, with work intended to be completed by 2022.

For more information on companies in this article

Related Content

  • Rapid replacement of multiple bridges – the plan
    December 14, 2017
    The US State of Pennsylvania is saving itself $220 million over 10 years on a programme to replace 558 bridges with an unusual public private partnership approach - Kristina Smith writes It is called the Rapid Bridge Replacement Programme with good reason. Pennsylvania’s Department of Transport, PennDOT, wants to see no less than 558 structurally deficient bridges replaced with newly designed and constructed ones, all within four years. Using traditional forms of procurement this programme would be like
  • Developments in tolling technology
    February 27, 2012
    Jason Barnes reviews the last few decades and the future of tolling technology. Tolling and charging technology has evolved significantly over the last three decades and that evolution is perhaps best illustrated by reductions in or complete removal of impedances to physical progress. Once, it was customary for a driver to pull up to a barrier, make some form of cash payment to a human operative in a booth, and then wait for the barrier to be raised before proceeding. Humans were eventually complemented and
  • Montreal’s new Champlain Bridge is in a race against time
    June 8, 2018
    Montreal’s US$3.24 billion Champlain Bridge across the St Lawrence River may not be open on time, according to a report by the independent Auditor General. The 3.4km cable-stayed bridge has two decks supporting three lanes of highway traffic in each direction. A third, central deck supports a mass transit system and a multi-use path. The new bridge will replace the nearby 50-year-old Champlain Bridge which has been deteriorating at an alarming rate. The government signed a contract in 2015 with a private
  • Ethiopia’s new tolled highway opens
    June 21, 2019
    Ethiopia is now benefiting from a new tolled route, improving transport between Dire Dawa and Dewele.