Skip to main content

Riga's transport infrastructure system to get a boost from EU funding

The European Union will support with over €1.5 million from the TEN-T Programme a series of studies looking at the connection of the Freeport of Riga in Latvia to the TEN-T road network. The studies, selected under the 2012 TEN-T Annual Programme, specifically concern the detailed design needed ahead of the construction in 2016 of a 9.1km stretch (Segment 1) of the Riga Northern Transport Corridor (Northern Corridor). The Northern Corridor is an east-west motorway which will cross the old historic town ce
February 11, 2014 Read time: 2 mins
The 1116 European Union will support with over €1.5 million from the TEN-T Programme a series of studies looking at the connection of the Freeport of Riga in Latvia to the TEN-T road network.

The studies, selected under the 2012 TEN-T Annual Programme, specifically concern the detailed design needed ahead of the construction in 2016 of a 9.1km stretch (Segment 1) of the Riga Northern Transport Corridor (Northern Corridor).

The Northern Corridor is an east-west motorway which will cross the old historic town centre of Riga for a total length of 30km. In the east it will join the Freeport of Riga and the E67 ‘Via Baltica’ motorway, while in the west it will connect the Riga bypass and, ultimately, the E22 motorway.

The Northern Corridor will create a robust alternative for transit traffic by diverting road traffic from of Riga’s old town, improving the local environmental conditions and, by enabling access to the port of Riga, enhancing multimodal transport.

The studies will be monitored by the Innovation and Networks Executive Agency (INEA) and are set to be completed by December 2015.

For more information on companies in this article

Related Content

  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l
  • R&W takes in-house the recycling of dry and wet waste
    January 15, 2016
    With the introduction of EU regulations in 2012 controlling the disposal of dry and wet waste from road sweepings and gully waste and it is not acceptable to send this material to landfill. Many local authorities have had to find an alternative solution. R&W Civil Engineering in the southern UK country of Hampshire, is a specialist in highway construction, maintenance and other transport related services. It, along with other contractors started transporting waste material to the nearest processing stati