Skip to main content

Remote working for Avery Dennison on the island of St. Helena

Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of Avery Dennison Refiective Solutions most remote traffic sign projects. The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 af
March 22, 2017 Read time: 2 mins
Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of 1540 Avery Dennison Refiective Solutions most remote traffic sign projects.

The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 after his defeat at the Battle of Waterloo. He died there in 1821.

Today, the island’s population of just over 4,500 is hoping that the new airport – when opened - will boost tourism to make the island self-sufficient. To replace the five-day boat trip from Africa, the UK government ploughed upwards of US$346 million to build the airport which has yet to open because of remaining concerns about wind shear affecting landing aircraft.

However, the road infrastructure for the design-build-operate airport project is in place, thanks to work by Basil Read. Deon De Jager, Basil Read’s director for St Helena, contracted Repro Signs, a South African traffic sign fabricator, to supply signage for the project. Repro Signs chose products from Avery Dennison Refiective Solutions.

Avery Dennison products, sent by Repro Signs from South Africa, included reflective sheeting and sign-converting supplies required to create all of the project’s highway signs. Given the sea voyage delivery time, all orders had to be filled perfectly first time every time, said Johan Winterbach, southern Africa area business manager for Avery Dennison.

For more information on companies in this article

Related Content

  • Variable message signs deliver real time travel information
    April 10, 2012
    Variable Message Sign systems are helping ease traffic congestion and keeping drivers better informed on key highways across Europe and the rest of the world. Guy Woodford looks at some of their recent applications By coupling its Intelligent Travel Time System (ITTS) with Bluetooth technology, Alcatel-Lucent is measuring traffic flow in real time and conveying it seamlessly to local authorities in the French city of Vélizy-Villacoublay. The city, a major business enterprise hub 14km south-west of central
  • Morelock's 3M sign sheets
    February 7, 2012
    Using the latest technology from 3M has helped UK sign-maker Morelock to achieve the new European harmonised standard BS EN 12899:2007 for fixed vertical road traffic signs. The signs also feature the CE mark and use the latest 3M reflective sheeting.
  • Viaduct implosion during works ahead of 2016 Olympics in Rio de Janeiro, Brazil
    January 22, 2014
    A just released video shows the dramatic implosion of a Rio de Janeiro viaduct as part of the Brazilian city’s preparatory works for the 2016 Olympic Games. Fábio Bruno Construções (FBC), the company behind the blast, shot the seven-minute film in November 2013 to illustrate what happens behind the scenes on this kind of project. The film illustrates how FBC expertly used explosives to simply drop the viaduct down a level in a controlled and pre-determined manner.
  • EIB backing Irish motorway link
    April 30, 2014
    The European Investment Bank (EIB) is providing financial backing worth €144 million for the new M17/M18 Gort-Tuam motorway project. The M17/M18 Gort to Tuam PPP Scheme is situated in the west of Ireland and will be constructed as a four lane motorway that will replace the existing N17/N18 roads. This new motorway will reduce journey times by around 20 minutes and has an overall cost estimated at €550 million. Construction work will start during this year and this is the second transport PPP to be signed un