Skip to main content

RBF Consulting selected for 'hot spots' feasibility analysis

RBF Consulting has been selected by the Los Angeles County Metropolitan Transportation Authority to provide transportation planning and engineering for the Measure R funded I-605 Congestion 'Hot Spots' Feasibility Analysis.
February 27, 2012 Read time: 2 mins
RBF Consulting has been selected by the 3227 Los Angeles County Metropolitan Transportation Authority to provide transportation planning and engineering for the Measure R funded I-605 Congestion ‘Hot Spots’ Feasibility Analysis. Hot spots are identified as major traffic congestion areas, attributed to increasing passenger car and truck traffic, localised capacity and/or operational constraints on the freeway, or arterial street system.

The purpose of this feasibility analysis is to analyse congestion improvement alternatives for various hot spots along over 64 kms of the I-605, SR-91, I-405 and I-105 freeways, as well as the surrounding arterial street network. This study will include improvements to freeway-to-freeway interchange and additional freeway general-purpose lanes, as well as arterial street improvements through numerous cities. The results of the analysis will also be used to develop and prepare a transportation strategic funding plan for the existing and proposed transportation projects in the Gateway Cities.

RBF Consulting, which has over 25 years of experience in transportation planning and engineering on state highways, will lead the project team as the prime consultant. “We are pleased to have the opportunity to apply our expertise to the I-605 Hot Spots Feasibility Analysis and to accomplish the LA Metro and Gateway Cities COG goals of improved mobility, preserving local economies and enhancing the quality of life in the community,” stated Steve Huff, RBF senior VP and Southern California practice leader for transportation, who is serving as the project manager for the feasibility analysis.

For more information on companies in this article

Related Content

  • Highways Agency appoints firms to consider A27 bypass options
    December 15, 2014
    The Highways Agency in the UK has appointed a joint venture between Mott MacDonald and Grontmij to analyse various options for upgrades to the A27 Chichester Bypass. The aim of this project is to improve traffic flow and relieve congestion. The bypass is a 5km dual carriageway with five roundabouts and one signal control junction. It provides a key east-west transport link along the south coast of England. This connects Brighton, Worthing, Chichester, Portsmouth, Southampton. It currently suffers from heavy
  • Panama highway rebuilt with concrete
    January 5, 2017
    A highway link to the north of Panama´s capital city that connects with a national park popular with tourists, has now been rebuilt Cement producer and concrete specialist CEMEX carried out a study into the project, to find a cost effective solution. And working with CEMEX, Panama’s Ministry of Public Works began planning for the project in 2015. A 5.7km stretch of the highway has now been improved, with the road structure being built from concrete.
  • “Bold and brave” rallying call to cash-starved UK highway maintenance teams
    July 24, 2012
    UK local authorities and other organisations must be “bold and brave” in their structuring of repair and maintenance works, delegates at a key road engineering conference in Birmingham, central England were told. Speaking at the Developments in Pavement Assessment (DIPA 2012) event Les Hawker, highways manager at Transport for London (TfL), said: “There is no extra money and only 20% of the [Government budget] cuts have taken place so far. Over the next five years the other 80% of cuts will come through. Or
  • A global perspective on sustainable transportation systems
    August 21, 2013
    With nearly 400 participants from 21 countries and tribal nations, the recent 2013 International Conference on Ecology and Transportation (ICOET) held in Scottsdale, Arizona, USA, was a resounding success – writes Leonard Sielecki The five-day conference ran from June 23rd-27th 2013, and attracted transportation planners, engineers, environmentalists, and academics from national and state agencies, universities, and non-government organisations. It was organised and co-sponsored by the Center for Trans