Skip to main content

PB developing I-35 corridor plan

The City of Austin, Texas, has awarded a contract to Parsons Brinckerhoff for the development of a transportation corridor plan along an 18.5km section of IH 35 in central Austin. A variety of potential highway, transit, bike and pedestrian improvements are anticipated to be generated from a process which will apply a context sensitive process involving a wide range of agency and public stakeholders.
March 21, 2012 Read time: 1 min

The City of Austin, Texas, has awarded a contract to 2693 Parsons Brinckerhoff for the development of a transportation corridor plan along an 18.5km section of IH 35 in central Austin. A variety of potential highway, transit, bike and pedestrian improvements are anticipated to be generated from a process which will apply a context sensitive process involving a wide range of agency and public stakeholders.

PB is leading a multidisciplinary team involved in collecting, evaluating, ranking and prioritising a wide range of mostly short- and medium-term transportation improvements along the corridor. In addition to overall management, the firm's specific roles include planning and evaluating alternatives, traffic and civil engineering analysis, cost estimating, public and stakeholder outreach and program development of recommended solutions. The company also leads the agency partnering process that includes coordination with concurrent transit, highway and toll road studies and projects under way in the Austin area.

For more information on companies in this article

Related Content

  • Morocco tunnel project proposed
    February 17, 2023
    Morocco is proposing a major tunnel project.
  • Swarco triumphs in Paris
    March 3, 2022
    Swarco has been chosen to help modernise traffic management in Paris by using its MyCity solution
  • Key road link opens in San Antonio, Texas
    October 11, 2013
    A new road link in the Texan city of San Antonio will help future industrial development in the area. The new 2.7km connection provides a four-lane extension of 36th Street from Highway 90 into the centre of Port San Antonio at Billy Mitchell Boulevard. The new route will allow for the future closure of North Frank Luke Drive, a small road running parallel to the runway at Kelly Field, the port’s industrial airport. This will provide direct access to the airport from the port and the area will be suitable f
  • Automated testing is safer, cheaper and more thorough
    May 10, 2019
    New tests for cracking and rutting are easy to perform, use existing equipment and work well on mixes with different binders and recycled content - Kristina Smith writes Researchers at the Texas A&M Transportation Institute (TTI) have developed new tests for cracking and rutting, designed to be quick and easy to carry out, using existing laboratory equipment. The most advanced of these is the IDEAL Cracking Test (IDEAL-CT), which could be appearing in specifications in some of the US states in around six