Skip to main content

By-pass project in Montpellier relaunched

The bypass in southeastern France will connect the A750 and A709 motorways, according to Vinci Autoroutes, the project manager.
By David Arminas November 7, 2023 Read time: 1 min
Montpellier, France: not much room for traffic (image © Jaysi/Dreamstime)

The west by-pass of the southern French city of Montpellier has been relaunched, a €270 million project to build 6km of dual carriageway.

The bypass will connect the A750 and A709 motorway, according to Vinci Autoroutes which will be the project manager. The route will be between the municipalities of Juvignac and Saint-Jean-de-Védas.

Construction on the design-build-operate project is expected to start by the beginning of 2026 for final commissioning by 2030.

For more information on companies in this article

Related Content

  • AtkinsRéalis wins Île d’Orléans Bridge work
    May 2, 2024
    VIDEO: The new US$1.96 billion replacement Île d’Orléans Bridge near Quebec city, Canada, will feature two wider lanes of traffic, shoulders, multi-use lanes for pedestrians and cyclists as well as redevelopment of a major interchange and creation of green spaces.
  • Svevia in Fjälkinge and Gualöv motorway deal
    April 7, 2023
    Under the contract in southern Sweden - worth around €45 million - the state-owned civil engineering company will also construct six bridges of which two will be fauna passages.
  • Warm mix use in the US and Czech Republic is strong
    May 20, 2014
    The Czech Republic has seen its first ever use of warm mix produced using additive Evotherm - and a survey carried out in the US shows that warm mix is still on the rise there - Kristina Smith reports The troubled Blanka Tunnel in Prague will see the Czech Republic’s first ever use of Evotherm warm mix asphalt (WMA) technology. The 6km tunnel is the longest urban motorway tunnel in Europe and will take the north-west section of the city ring road below ground. Designed as dual carriageway throughout w
  • Poland place Via Carpatia on list of priorities
    July 18, 2017
    The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023. The government also increased the budget for building roads by €6.7 billion to €32.1 billion. The announcements are part of the National Road Construction Programme (PBDK).